Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan for''' '''Oct. 13th to Oct. | + | == '''Run Plan for''' '''Oct. 13th to Oct. 18th''', 2023 == |
* '''Friday, Oct. 13th, Swing Shift''': | * '''Friday, Oct. 13th, Swing Shift''': | ||
:• '''P.S.: While approaching the end of the ongoing run, please contact the SVT/MVT experts, Yuri and Rafo, to keep an eye on MVT during the next Lumi. scan run. Also, please watch the DC occupancy on mon12 and refresh it frequently during the Lumi. scans. | :• '''P.S.: While approaching the end of the ongoing run, please contact the SVT/MVT experts, Yuri and Rafo, to keep an eye on MVT during the next Lumi. scan run. Also, please watch the DC occupancy on mon12 and refresh it frequently during the Lumi. scans. | ||
Line 61: | Line 61: | ||
::- ''DAQ Config.'': <tt>'''PROD66'''</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>'''PROD66'''</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
::- ''Trigger file'': '''rgd_out_v1.0.trg''' | ::- ''Trigger file'': '''rgd_out_v1.0.trg''' | ||
− | :• Continue CxC production for the next couple of days | + | * '''Saturday, Oct. 14th, Swing - Wednesday, Oct. 18th, Day Shift''': |
+ | :• Continue CxC production for the next couple of days at 50 nA and 100 M runs with the following configuration: | ||
+ | ::- ''DAQ Config.'': <tt>'''PROD66'''</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
+ | ::- ''Trigger file'': '''rgd_out_v1.0.trg''' | ||
:• ''To-be-continued'' | :• ''To-be-continued'' | ||
<!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>-->. | <!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>-->. |
Revision as of 17:53, 13 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540 (or 757-223-6213)
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Current Issues
- If new hot channels appear in BMT/FMT/SVT, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- If the tagger magnet needs to be turned off, tell the operator to use only the script only for degaussing, NEVER do "by hand"!
- In case of questions from MCC about the necessary controlled access to change the LD2 and solid targets positions in the hall, please refer to the logbook entry #: 4196113 for the access requirements.
Run Plan for Oct. 13th to Oct. 18th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|