Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
::- The shift expert should know about and refer to logbook entries in their shift summary | ::- The shift expert should know about and refer to logbook entries in their shift summary | ||
::- The shift worker should discuss an issue with the shift expert before making extra logbook entries | ::- The shift worker should discuss an issue with the shift expert before making extra logbook entries | ||
− | :◊ For advice, do not hesitate to call the RC first and foremost, day | + | :◊ For advice, do not hesitate to call the RC first and foremost, day or night. |
== Current Issues == | == Current Issues == | ||
Line 94: | Line 94: | ||
* Do not run more than 30 minutes above 90 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. | * Do not run more than 30 minutes above 90 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. | ||
* Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | * Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | ||
− | * <b> RICH </> issues: put screen shots of scalers and temperatures in the RICH logbook. | + | * <b> RICH </b> issues: put screen shots of scalers and temperatures in the RICH logbook. |
* For '''beam tuning and Møller runs''', please make sure the SVT/MVT are set as follows: '''SVT: LV ON; HV OFF''', and '''MVT: LV ON; HV ON in SAFE Mode.''' | * For '''beam tuning and Møller runs''', please make sure the SVT/MVT are set as follows: '''SVT: LV ON; HV OFF''', and '''MVT: LV ON; HV ON in SAFE Mode.''' | ||
:◊ When '''turning MVT OFF''', do not press "BMT HV OFF" from HV->Overview->Actions, but instead '''select BMT HV ON - Safe Voltage'''. The same thing applies to FMT '''select FMT HV ON - Safe Voltage'''. | :◊ When '''turning MVT OFF''', do not press "BMT HV OFF" from HV->Overview->Actions, but instead '''select BMT HV ON - Safe Voltage'''. The same thing applies to FMT '''select FMT HV ON - Safe Voltage'''. |
Revision as of 20:21, 15 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540 (or 757-223-6213)
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- If new hot channels appear in BMT/FMT/SVT, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- If the tagger magnet needs to be turned off, tell the operator to use only the script only for degaussing, NEVER do "by hand"!
- In case of questions from MCC about the necessary controlled access to change the LD2 and solid targets positions in the hall, please refer to the logbook entry #: 4196113 for the access requirements.
- Until further notice, please ignore for now the empty six sectors "ECAL_adcSum" in mon12 histograms as that is under investigation to be either fixed or removed.
Run Plan for Oct. 13th to Oct. 18th, 2023CxC production for the next couple of days
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|