Difference between revisions of "Template:ShortTermSchedule-RGD"
Line 53: | Line 53: | ||
::◊ As soon as the work is done in the hall, the RadCon can be requested to sweep and thus lock up the hall to switch back to "Beam Permit." Also, Eugene needs to be contacted to ramp up both magnets. | ::◊ As soon as the work is done in the hall, the RadCon can be requested to sweep and thus lock up the hall to switch back to "Beam Permit." Also, Eugene needs to be contacted to ramp up both magnets. | ||
* '''Wednesday, Oct. 25<sup>th</sup>, Swing Shift''': | * '''Wednesday, Oct. 25<sup>th</sup>, Swing Shift''': | ||
− | :• Please follow the steps to establish the beam to tagger dump, energize the tagger magnet, mask beam halos, and take a harp scan in 2C21 and 2C24A (tagger Harp) | + | :• Please follow the steps to establish the beam to tagger dump, energize the tagger magnet, move the collimator to Blank position, mask beam halos, ask for 5 nA beam current, check the 2C21A and 2C24A beam positions (x, y) recorded at the bottom of this page, and take a harp scan in 2C21 and 2C24A (tagger Harp) if they are fine. Please log your results after comparing them with the reference ones at the bottom of this page. Then, take a Møller run with a 1/2-wave plate IN. |
− | :• Next, the collimator needs to be moved to a 20 mm position, unmask beam halos, and '''change the target to "Empty" from the drop menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. Then, ask for a 5 nA beam to FCup, take a harp scan in 2H01, and compare their results with the reference one at the bottom of this page. Please log these results, too. | + | :• Next, the collimator needs to be moved to a 20 mm position, unmask beam halos, and '''change the target to "Empty" from the drop menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. Then, ask for a 5 nA beam to FCup, check the 2C24A and 2H01 beam positions (x, y) recorded at the bottom of this page, take a harp scan in 2H01, and compare their results with the reference one at the bottom of this page. Please log these results, too. |
:• If everything is fine, please insert CuSn back in the beamline from the same drop-menu mentioned above and resume CuSn data-taking as follows: | :• If everything is fine, please insert CuSn back in the beamline from the same drop-menu mentioned above and resume CuSn data-taking as follows: | ||
<!--* Continue production on CuSn target as follows:--> | <!--* Continue production on CuSn target as follows:--> |
Revision as of 19:41, 24 October 2023
Run Coordinator: Utsav Shrestha (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- BMT/FMT/SVT:
- ◊ If new hot channels appear, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- Tagger magnet procedure If the tagger magnet needs to be turned off, tell the operator to use only the script for degaussing, NEVER do "by hand"!
- Change the LD2 and solid targets positions in the hall: In case of questions from MCC about the necessary controlled access, please refer to the logbook entry #: 4196113 for the access requirements.
- Please ensure the ZOOM session is ALWAYS running in the counting house, as it gets automatically disconnected after being idle with one end user for a while. See its remote connection under the Shift Worker tab.
Run Plan for Tue., Oct. 24th - Mon., Oct. 30th, 2023
P.S.: If the beam is widely fluctuating above 90 nA, please ask MCC to narrow down the fluctuation margin and give us the required 90 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!
DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions
Every Shift:
Every Run:
To access the Hall:
|