Difference between revisions of "Template:ShortTermSchedule-RGD"
Line 45: | Line 45: | ||
* Depending on the progress of the last 100 nA CuSn run, please call MCC whenever the run ends between 3 and 5 AM and ask them to take the beam away for a couple of minutes to retract the Beam Blocker for the beamline, then request 30 nA for a low Lumi run for the next 4 to 5 hours (''TBD by the RC later''). | * Depending on the progress of the last 100 nA CuSn run, please call MCC whenever the run ends between 3 and 5 AM and ask them to take the beam away for a couple of minutes to retract the Beam Blocker for the beamline, then request 30 nA for a low Lumi run for the next 4 to 5 hours (''TBD by the RC later''). | ||
− | * Whenever the RC decides to end the low Lumi. run, she will contact '''the engineering on-call (primary and/or secondary) to change the target position in the hall to the liquid target position'''. | + | <!--* Whenever the RC decides to end the low Lumi. run, she will contact '''the engineering on-call (primary and/or secondary) to change the target position in the hall to the liquid target position'''. |
:• '''In parallel with the rapid (controlled) access, the LD2 cell will be filled from the Hall B cryotarget GUI, and the solid-foil flag assembly will be set to "Empty". For more details, see the cryo-target and flag assembly [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | :• '''In parallel with the rapid (controlled) access, the LD2 cell will be filled from the Hall B cryotarget GUI, and the solid-foil flag assembly will be set to "Empty". For more details, see the cryo-target and flag assembly [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | ||
Line 54: | Line 54: | ||
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
:- DAQ configuration: <tt>'''PROD67'''</tt> | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
− | :- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg''' | + | :- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg'''--> |
<!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> | <!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> |
Revision as of 09:00, 14 December 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-) 757 876-1789; Office: x5902
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-D Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Wednesday, Dec. 13th - Friday, Dec. 15th, 2023
P.S.: If the beam is widely fluctuating above 105 nA, constantly overshooting over 105 nA on 2C21A, please ask MCC to narrow down the fluctuation margin to keep it below 105 nA based on 2C21A reading. They could put the beam current monitor lock on 2C21A in case that may help with the wide fluctuation and/or adjust our laser phase as well as narrow down the slit width, see ELOG entries 4224300 and 4225220.
|
General Instructions
|
|
|
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [3]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)