Line 44: | Line 44: | ||
:: 13:00 – 16:00 – Beam tuning + Moller run | :: 13:00 – 16:00 – Beam tuning + Moller run | ||
::: - Tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ::: - Tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ||
− | ::: - Take | + | ::: - Take three Moller runs, one with each target polarization direction, flip HWP and take another run (<font color="red">Nathan Baltzell</font>) |
::: - Tune beam to Faraday cup with empty target (<font color="red">Eugene Pasyuk</font>) | ::: - Tune beam to Faraday cup with empty target (<font color="red">Eugene Pasyuk</font>) | ||
::: - Fill LH2 target (<font color="red">Chris Keith</font>, <font color="red">James Brock</font>) | ::: - Fill LH2 target (<font color="red">Chris Keith</font>, <font color="red">James Brock</font>) | ||
Line 51: | Line 51: | ||
::: - Pin runs for immediate cooking - (DAQ reset, configure, download using PROD67_PIN configuration) | ::: - Pin runs for immediate cooking - (DAQ reset, configure, download using PROD67_PIN configuration) | ||
:: 21:00 – 24:00 – Luminosity scans (shifters) | :: 21:00 – 24:00 – Luminosity scans (shifters) | ||
− | ::: - Take | + | ::: - Take runs with 10M events at 10, 20, 30, 40, 50, 60, 75, 90 nA (90 nA only if possible - check with RC) |
*'''Saturday, Dec. 16''': | *'''Saturday, Dec. 16''': | ||
:: 00:00 – 08:00 – Luminosity scans cont'd (shifters) | :: 00:00 – 08:00 – Luminosity scans cont'd (shifters) | ||
− | ::: - Take | + | ::: - Take runs with 10M events at 10, 20, 30, 40, 50, 60, 75, 90 nA (90 nA only if possible - check with RC) |
:: 08:00 – 22:00 - DC test plan part I (<font color="red">Florian Hauenstein</font>) | :: 08:00 – 22:00 - DC test plan part I (<font color="red">Florian Hauenstein</font>) | ||
::: - DC HV studies (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ::: - DC HV studies (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ||
Line 61: | Line 61: | ||
::: - Pin runs for immediate cooking - (DAQ reset, configure, download using PROD67_PIN configuration) | ::: - Pin runs for immediate cooking - (DAQ reset, configure, download using PROD67_PIN configuration) | ||
:: 22:00 – 24:00 – Data collection (shifters) | :: 22:00 – 24:00 – Data collection (shifters) | ||
− | ::: - Run with nominal trigger (no DC roads, | + | ::: - Run with nominal trigger (no DC roads, 200 MeV ECAL threshold) |
::: - Use nominal DC setting defined by Florian | ::: - Use nominal DC setting defined by Florian | ||
Revision as of 13:42, 15 December 2023
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Bill Briscoe (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Friday, Dec. 15 - Tuesday, Dec. 19, 2023
|
General Instructions
|
DAQ Operation & Related General Instructions
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [3]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)