Difference between revisions of "Template:ShortTermSchedule-RGK"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan''', ''' | + | == '''Run Plan''', '''Thursday, Jan. 11 - Friday, Jan. 13, 2024'''== |
− | *''' | + | *'''Thursday, Jan. 11''': |
:: 07:00 – 10:00 - Beam tuning + Moller run | :: 07:00 – 10:00 - Beam tuning + Moller run | ||
::: - Tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ::: - Tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ||
Line 44: | Line 44: | ||
::: - Turn all detectors on; use nominal DC HV setting (10, 11, 11); torus and solenoid should be off | ::: - Turn all detectors on; use nominal DC HV setting (10, 11, 11); torus and solenoid should be off | ||
::: - Take alignment run with warm/empty target | ::: - Take alignment run with warm/empty target | ||
− | :::: - | + | :::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2-2.5%) - RC will dictate final beam current for all alignment runs |
− | :::: - Use | + | :::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration |
:::: - Normalize the DAQ trigger alarms once final beam current is chosen | :::: - Normalize the DAQ trigger alarms once final beam current is chosen | ||
− | :::: - Take data for 6-8 hours ( | + | :::: - Take data for 6-8 hours (2.5 M FD trigger events) |
::: - Take alignment run as target system cools | ::: - Take alignment run as target system cools | ||
:::: - Begin target system cooldown (<font color="red">James Brock</font>) | :::: - Begin target system cooldown (<font color="red">James Brock</font>) | ||
− | :::: - While target system cools (should take about 8 hours) take data ( | + | :::: - While target system cools (should take about 8 hours) take data (3-5 nA beam as previous step) |
− | :::: - Use | + | :::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration |
− | :::: - Take data for 6-8 hours ( | + | :::: - Take data for 6-8 hours (2.5 M FD trigger events) |
− | *''' | + | *'''Friday, Jan. 12''': |
:: 00:00 – 10:00 - Alignment runs (continued) | :: 00:00 – 10:00 - Alignment runs (continued) | ||
::: - Take alignment run with cold/empty target | ::: - Take alignment run with cold/empty target | ||
− | :::: - | + | :::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2-2.5%) |
− | :::: - Use | + | :::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration |
− | :::: - Take data for 6-8 hours ( | + | :::: - Take data for 6-8 hours (2.5 M FD trigger events) |
:: 10:00 – 13:00 - Prepare for production running | :: 10:00 – 13:00 - Prepare for production running | ||
::: - Ramp up the torus (-100%) and the solenoid (100% POSITIVE polarity) (<font color="red">Eugene Pasyuk</font>) | ::: - Ramp up the torus (-100%) and the solenoid (100% POSITIVE polarity) (<font color="red">Eugene Pasyuk</font>) | ||
Line 65: | Line 65: | ||
:: 13:00 – 16:00 - Production running | :: 13:00 – 16:00 - Production running | ||
::: - Take first production data run - rgk_noDC_v1.0_300MeV.trg, PROD67_PIN configuration | ::: - Take first production data run - rgk_noDC_v1.0_300MeV.trg, PROD67_PIN configuration | ||
− | ::: - Data run should use 75 nA beam; collect 100M events - RC will dictate final beam current | + | ::: - Data run should use 75 nA beam; collect 100M events - RC will dictate final beam current (R1 DC occupancies < 5% and DAQ livetime ~90%) |
::: - Normalize the DAQ trigger alarms once final beam current is chosen | ::: - Normalize the DAQ trigger alarms once final beam current is chosen | ||
::: - Review all mon12 and Hydra plots throughout the run | ::: - Review all mon12 and Hydra plots throughout the run | ||
Line 76: | Line 76: | ||
::: - Post standard beamline overview screen and DAQ screens (CLAS12 Trigger Bits, ROC Rates, ROC Busies, DAQ status) in the logbook | ::: - Post standard beamline overview screen and DAQ screens (CLAS12 Trigger Bits, ROC Rates, ROC Busies, DAQ status) in the logbook | ||
− | *''' | + | *'''Saturday, Jan. 13''': |
:: 00:00 – 24:00 – Production running (continued) | :: 00:00 – 24:00 – Production running (continued) | ||
::: - Take production data - rgk_noDC_v1.0_300MeV.trg, PROD67 configuration | ::: - Take production data - rgk_noDC_v1.0_300MeV.trg, PROD67 configuration |
Revision as of 20:17, 9 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Axel Schmidt (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Thursday, Jan. 11 - Friday, Jan. 13, 2024
|
General Instructions
|
DAQ Operation & Related General Instructions
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-K
- 2C21A [3]: x= -0.4 mm; y= +0.6 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2H01 [5]; x= -1.4 mm; y= 0.0 mm