Difference between revisions of "Template:ShortTermSchedule-RGK"
Jump to navigation
Jump to search
Line 36: | Line 36: | ||
== '''Run Plan''', '''Saturday, Jan. 13 - Tuesday, Jan. 16, 2024'''== | == '''Run Plan''', '''Saturday, Jan. 13 - Tuesday, Jan. 16, 2024'''== | ||
− | + | ''' Take Production Data ''' | |
: Trigger is rgk_noDC_v1.0_300MeV.trg ; PROD67 configuration; collect 200M events per run | : Trigger is rgk_noDC_v1.0_300MeV.trg ; PROD67 configuration; collect 200M events per run | ||
: 65 nA beam current for now, though this may change | : 65 nA beam current for now, though this may change | ||
Line 54: | Line 54: | ||
:: 00:00 – 07:00 – Take production data | :: 00:00 – 07:00 – Take production data | ||
:: Approx. 07:00, Accelerator will turn off to permit work in the tunnel. | :: Approx. 07:00, Accelerator will turn off to permit work in the tunnel. | ||
+ | |||
+ | | valign=top width=50% | | ||
==<font color=BLACK>''' General Information'''</font>== | ==<font color=BLACK>''' General Information'''</font>== |
Revision as of 15:02, 13 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Axel Schmidt (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- Shifters should make sure to log every DC trip in a logbook post. Make sure to list WHERE the trip occured.
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- Arrive at least 10 minutes early for shift change;
- Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- Important links
- Recent Changes and Current Issues
- General How-to for beam restoration procedures and Møller runs.
Run Plan, Saturday, Jan. 13 - Tuesday, Jan. 16, 2024Take Production Data
|
General Information
|
DAQ Operation & Related General Information
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-K
* Tagger (2C24A) x= -1.7 mm; y= +0.5 mm * 2H01 x= -0.7 mm; y= +0.6 mm * 2C21A x= -0.4 mm; y= +0.7 mm (not important for production!?)
- Tagger (2C24A)
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238887
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238638 x= -2.0 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238622
- 2H01
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238889
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238673 x= -1.1 mm; y= 0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4234764
- 2C21A
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238636 x= -0.4 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238636
To Do Items
- Faraday Cup Calibration
- Empty target running (with full field)