Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1605705819), except on Wednesdays, which is on ZOOM ONLY @ 15:30.
Line 27: | Line 27: | ||
In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. | In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. | ||
− | LD2+ | + | LD2+C runs |
* Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | * Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | ||
− | * Beam Current: | + | * Beam Current: 85 nA |
* Use <tt>PROD67</tt> configuration (this will not PIN data) | * Use <tt>PROD67</tt> configuration (this will not PIN data) | ||
* 3-hour runs | * 3-hour runs |
Revision as of 11:18, 8 April 2024
Run Coordinator: Kevin Giovanetti (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pull down menu to choose where an error is reported.
Production data taking
In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. LD2+C runs
For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 Long term run plan [1] |
ReferencesBPM Positions
Harp ScansFSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!
Charge Asymmetry |
General Reminders
|
DAQ Operation
|