Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1605705819), except on Wednesdays, which is @ 15:00 in CH Room 200C and via the same ZOOM link.
Line 29: | Line 29: | ||
* For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | * For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | ||
+ | |||
+ | * Long-term run plan was also highlighted in this [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323 RG-E Calendar link] | ||
=== '''Outbending Configuration Runs''' === | === '''Outbending Configuration Runs''' === | ||
:<font color=Brown>• Beam Blocker: IN | :<font color=Brown>• Beam Blocker: IN | ||
:• Beam Current: 70 nA | :• Beam Current: 70 nA | ||
− | :• Target: LD2+ | + | :• Target: LD2+Pb |
:• Configuration: <tt>PROD67</tt> (w/o. PIN option) | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
:• Trigger: <tt>rge_noDC_v1.0_300MeV.trg</tt> | :• Trigger: <tt>rge_noDC_v1.0_300MeV.trg</tt> | ||
:• 3-hour or 100 M events run, whatever comes first!</font> | :• 3-hour or 100 M events run, whatever comes first!</font> | ||
− | + | <!--and is outlined below::# Take outbending data with LD2+C, then LD2+Pb until the beam is taken away on May 19<sup>th</sup> at 7 a.m. for the accelerator beam studies.--> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | :# Take outbending data with LD2+C then LD2+Pb until the beam is taken away on May 19<sup>th</sup> at 7 a.m. for the accelerator beam studies. | ||
== ''Previous Dual-target Configuration Plans'' == | == ''Previous Dual-target Configuration Plans'' == | ||
Line 113: | Line 107: | ||
:• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | :• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | ||
:• Take one Empty+Al run @ 70 nA w/. BB for 5 hours (w/. Beam ON) | :• Take one Empty+Al run @ 70 nA w/. BB for 5 hours (w/. Beam ON) | ||
− | :• Take one Empty+Wire run @ 200 nA w/. BB for approx. 8 hours (''BB calibration is done by Rafo and Lamiaa/MCC OPS | + | :• Take one Empty+Wire run @ 200 nA w/. BB for approx. 8 hours (''BB calibration is done by Rafo and Lamiaa/MCC OPS over phone'') |
+ | |||
+ | === '''Outbending Configuration Runs''' === | ||
+ | :• Beam Blocker: IN | ||
+ | :• Beam Current: 70 nA | ||
+ | :• Target: LD2+C | ||
+ | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
+ | :• Trigger: <tt>rge_noDC_v1.0_300MeV.trg</tt>, or | ||
+ | ::♦ Trigger: <tt>rge_noDC_v1.0_200MeV.trg</tt>, and Beam Current: 60 nA or | ||
+ | ::♦ Trigger: <tt>rge_noDC_v1.0_250MeV.trg</tt>, and Beam Current: 65 nA | ||
+ | :• 3-hour or 100 M events run, whatever comes first! | ||
| valign=top | | | valign=top | |
Revision as of 17:28, 18 May 2024
Run Coordinator: Sebouh Paul
Current RP Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 911 or 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements.
- In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.
- Please put all essential information on the main Hall B logbook HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.
Current Run Plan: May 17th to May 19th
Outbending Configuration Runs
Previous Dual-target Configuration Plans- DC firmware test plan (LD2 + Pb)1) Take one run each with 1M events with the trigger files and beam current at 70 nA
2) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_2.trg 3) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_4.trg
*** Notes ***
LD2+Pb runs
LD2+Sn runs
LD2+Al runs
Lumi Scan for LD2+Al on May 15th
Lumi Scan for LD2+Pb on May 15th - 16th
Streaming Readout Test
Empty-target runs on May 16th - 17th
Outbending Configuration Runs
|
References- BPM Positions
- Harp Scans- FSD Thresholds
- Charge Asymmetry- Upstream Halo counters
|
General Reminders
|
DAQ Operation
|