Difference between revisions of "RGM RC Meeting Jan26 Feb2"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
** Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN. | ** Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN. | ||
− | * running: 25nA LAr until | + | * running: 25nA LAr until today, Tuesday 8pm |
− | + | * single tin (200 mg/cm2) foil for 36 hours, beam blocker IN | |
− | + | ** have lumi scan for multiple foil tin, had 90 nA | |
− | ** Ca48 target, beam blocker IN | + | ** beam blocker calibration |
+ | |||
+ | * 1 hour empty target run | ||
+ | |||
+ | * tomorrow, Wednesday morning warm up LAr target to room temp | ||
+ | |||
+ | * Thursday 8am install Ca target | ||
+ | |||
+ | * Ca48 target (240 mg/cm2), beam blocker IN | ||
statistics: | statistics: | ||
[[File:Screenshot from 2022-02-01 13-44-30.png]] | [[File:Screenshot from 2022-02-01 13-44-30.png]] |
Revision as of 15:55, 1 February 2022
Tuesday, Feb 1, 2022
Short Term Schedule
- status: 6GeV beam, LAr target is full, Beam blocker is OUT
- Note to self: Presently, the alarm limit for the beam_stopper_alarm is raised for running without beam blocker .
- Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN.
- running: 25nA LAr until today, Tuesday 8pm
- single tin (200 mg/cm2) foil for 36 hours, beam blocker IN
- have lumi scan for multiple foil tin, had 90 nA
- beam blocker calibration
- 1 hour empty target run
- tomorrow, Wednesday morning warm up LAr target to room temp
- Thursday 8am install Ca target
- Ca48 target (240 mg/cm2), beam blocker IN
statistics: