Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ||
*** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files </font>. | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files </font>. | ||
− | **** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. | + | **** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. |
− | |||
* '''Monday, Sept. 25th''': | * '''Monday, Sept. 25th''': | ||
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! |
Revision as of 19:47, 14 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
End-of-run Plan (Please don't remove!)
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|