Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
* '''Thursday, Sept. 21st''': The tentative plan if everything progresses well with the target work is to lock up the hall in the day shift and start tunning the beam to the tagger dump in the swing/owl shift. | * '''Thursday, Sept. 21st''': The tentative plan if everything progresses well with the target work is to lock up the hall in the day shift and start tunning the beam to the tagger dump in the swing/owl shift. | ||
* '''Friday, Sept. 22nd''': | * '''Friday, Sept. 22nd''': | ||
− | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with new quadrupole power supply and tagger ramping/degaussing | + | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. |
− | ** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection | + | ** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. |
** '''Trigger validation''': | ** '''Trigger validation''': | ||
*** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''30 kHz random trigger'' to validate electron trigger; | *** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''30 kHz random trigger'' to validate electron trigger; | ||
Line 49: | Line 49: | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
− | ***Ask MCC for 45 nA beam current and take approximately 5 hours LD2 runs with 4 DC HV settings. A total of 120 M electron triggers is needed for this study | + | ***Ask MCC for 45 nA beam current and take approximately 5 hours LD2 runs with 4 DC HV settings. A total of 120 M electron triggers is needed for this study: two HV settings with 50 M each and the other two with 10 M each. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. |
***Take a 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run'''. | ***Take a 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run'''. | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. |
Revision as of 09:39, 18 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting
ZOOM Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|