Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 92: | Line 92: | ||
*** Ask MCC for 75 nA and take a 10 M triggers run. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 65 nA or until the level that the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan for this target should stop. </font> | *** Ask MCC for 75 nA and take a 10 M triggers run. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 65 nA or until the level that the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan for this target should stop. </font> | ||
*** Ask MCC for 90 nA and take a 10 M triggers run. <font color=brown> Depending on the detector's performance on previous runs; otherwise, it might be dropped! </font> | *** Ask MCC for 90 nA and take a 10 M triggers run. <font color=brown> Depending on the detector's performance on previous runs; otherwise, it might be dropped! </font> | ||
− | ** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC'' target until the end of the Swing shift but change DAQ | + | ** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Swing shift, but change the DAQ configuration as follows: |
*** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
**** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the OWL shift''-----</font></center> | **** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the OWL shift''-----</font></center> |
Revision as of 21:31, 21 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 on CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|