Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
***** ''Trigger file'': '''rgd_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ***** ''Trigger file'': '''rgd_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
**** ''N.B.'': We need to test during this run a different BMT config; thus, after taking ''beam-on-data for 3h45min'', the SVT/MVT experts will load a new BMT configuration with 16 samples, ''then start a new random trigger run to complete the remaining 15-min-BEAM-ON-data with such a configuration''. The SVT/MVT experts, Yuri or Rafo, need to be called while approaching the 3h45min end-of-run to be ready to reconfigure their BMTs. | **** ''N.B.'': We need to test during this run a different BMT config; thus, after taking ''beam-on-data for 3h45min'', the SVT/MVT experts will load a new BMT configuration with 16 samples, ''then start a new random trigger run to complete the remaining 15-min-BEAM-ON-data with such a configuration''. The SVT/MVT experts, Yuri or Rafo, need to be called while approaching the 3h45min end-of-run to be ready to reconfigure their BMTs. | ||
− | ***** '''P.S.: Before the random trigger run ends, please call the SVT/MVT experts, Yuri or Rafo, to prepare for their MVT bias and SVT ADC threshold studies during the next 1-hour-long LD2 run'''. | + | ***** '''P.S.: Before the random trigger run ends, please call the SVT/MVT experts, Yuri or Rafo, to prepare for their MVT bias and SVT ADC threshold studies during the next 1-hour-long LD2 run'''.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> |
*** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | *** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
** '''Parasitic studies''': | ** '''Parasitic studies''': | ||
− | *** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. | + | *** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. |
**'''DC HV Scan, TOF Gain and ECAL Calibrations''': | **'''DC HV Scan, TOF Gain and ECAL Calibrations''': | ||
*** ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | *** ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | ||
Line 52: | Line 52: | ||
*** '''P.S.: During the DC HV scan runs, please call the SVT/MVT experts, Yuri or Rafo, to perform their CVT bias scans'''. | *** '''P.S.: During the DC HV scan runs, please call the SVT/MVT experts, Yuri or Rafo, to perform their CVT bias scans'''. | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. | ||
− | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs. | + | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs. |
− | *** Take a 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run''' (''This could be done whenever it's convenient for Florian, even in-between LD2 Lumi. scans''). | + | *** Take a 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run''' (''This could be done whenever it's convenient for Florian, even in-between LD2 Lumi. scans'').<font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> |
* '''Saturday, Sept. 30th''': | * '''Saturday, Sept. 30th''': | ||
** '''LD2 Luminosity Scan''': | ** '''LD2 Luminosity Scan''': | ||
Line 67: | Line 67: | ||
**** Ask MCC for 75 nA and take a 50 M triggers run. | **** Ask MCC for 75 nA and take a 50 M triggers run. | ||
**** Ask MCC for 100 nA and take a 50 M triggers run. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | **** Ask MCC for 100 nA and take a 50 M triggers run. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | ||
− | *** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the shift, but change the DAQ configuration to: | + | *** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but change the DAQ configuration to: |
**** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift'' -----</font></center> |
*** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Swing shift with the <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file. | *** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Swing shift with the <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file. | ||
− | *** Parasitically, a scan of the RICH threshold should be performed based on Valery/Marco M.'s instructions. Once done, the RICH setting can be reverted to ''the nominal setting''.<font color=blue><center>-----''If everything goes well, that should bring us to the | + | *** Parasitically, a scan of the RICH threshold should be performed based on Valery/Marco M.'s instructions. Once done, the RICH setting can be reverted to ''the nominal setting''.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift'' -----</font></center> |
* '''Sunday, Oct. 1st''': | * '''Sunday, Oct. 1st''': | ||
− | ** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the | + | ** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Owl shift with the <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file. |
** '''Target Changeover''': | ** '''Target Changeover''': | ||
− | *** Denny/Xiaodong needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the | + | *** Denny/Xiaodong needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift'' ---</font></center> |
*** Once the access is done, put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h-BEAM-ON run as follows: | *** Once the access is done, put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h-BEAM-ON run as follows: | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
Line 81: | Line 81: | ||
** '''Solid-target, CxC Configuration, Luminosity Scan''': | ** '''Solid-target, CxC Configuration, Luminosity Scan''': | ||
*** '''P.S.: Before starting each luminosity scan run, please call the SVT/MVT experts, Yuri or Rafo, to check the HV setting of MVT'''. | *** '''P.S.: Before starting each luminosity scan run, please call the SVT/MVT experts, Yuri or Rafo, to check the HV setting of MVT'''. | ||
− | *** Ask MCC for 10 nA and take a | + | *** Ask MCC for 10 nA and take a 5 M triggers run. |
− | *** Ask MCC for 20 nA | + | *** We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, then increase the current to 35 nA, take 1.5 or 2 M events, and increase the current to 45 nA for another 1.5 M events. |
− | + | *** Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 50 nA, take roughly 1.5 M events, then increase the current to 75 nA, 1.5 or 2 M events, and increase the current to 90 nA for another 1.5 M events. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | |
− | *** | ||
− | |||
− | |||
− | |||
** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Swing shift, but change the DAQ configuration as follows: | ** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Swing shift, but change the DAQ configuration as follows: | ||
*** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. |
Revision as of 22:25, 24 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 on CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|