Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
***** ''Trigger file'': '''rgd_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ***** ''Trigger file'': '''rgd_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
**** ''N.B.'': We need to test during this run a different BMT config; thus, after taking ''beam-on-data for 3h45min'', the SVT/MVT experts will load a new BMT configuration with 16 samples, ''then start a new random trigger run to complete the remaining 15-min-BEAM-ON-data with such a configuration''. The SVT/MVT experts, Yuri and Rafo, need to be called (''at least 30 min in advance'') while approaching the 3h45min end-of-run to be ready to reconfigure their BMTs. | **** ''N.B.'': We need to test during this run a different BMT config; thus, after taking ''beam-on-data for 3h45min'', the SVT/MVT experts will load a new BMT configuration with 16 samples, ''then start a new random trigger run to complete the remaining 15-min-BEAM-ON-data with such a configuration''. The SVT/MVT experts, Yuri and Rafo, need to be called (''at least 30 min in advance'') while approaching the 3h45min end-of-run to be ready to reconfigure their BMTs. | ||
− | ***** '''P.S.: Before the random trigger run ends, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to prepare for their MVT bias and SVT ADC threshold studies during the next | + | ***** '''P.S.: Before the random trigger run ends, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to prepare for their MVT bias and SVT ADC threshold studies during the next one-hour-long LD2 run'''.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> |
*** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | *** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> |
Revision as of 21:04, 28 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|