Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 48: | Line 48: | ||
*** Ask MCC for 35 nA beam current and take a few LD2 runs with 4 DC HV settings. A total of 180 M electron triggers is needed for this study: two HV settings with 75 M each and the other two with 15 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf]. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. | *** Ask MCC for 35 nA beam current and take a few LD2 runs with 4 DC HV settings. A total of 180 M electron triggers is needed for this study: two HV settings with 75 M each and the other two with 15 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf]. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. | ||
*** '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | *** '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | ||
− | *** Parasitically, 75 M electron triggers are needed for the TOF gain calibration. | + | *** '''Parasitically''', 75 M electron triggers are needed for the TOF gain calibration. |
− | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | + | *** '''Parasitically''', the same data can be used to conduct a linearity study for the new ECAL PMTs.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> |
* '''Saturday, Sept. 30th''': | * '''Saturday, Sept. 30th''': | ||
** '''LD2 Luminosity Scan''': | ** '''LD2 Luminosity Scan''': | ||
Line 68: | Line 68: | ||
**** Ask MCC for 100 nA and take a 50 M triggers run with the following trigger file: | **** Ask MCC for 100 nA and take a 50 M triggers run with the following trigger file: | ||
***** ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | ***** ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | ||
− | *** | + | *** '''Parasitically''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. '''Florian needs to be notified to be present in the CR during this run'''. |
− | *** Parasitically to the EPICS run, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. | + | *** '''Parasitically to the EPICS run''', perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. |
*** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | *** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | ||
**** Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_50.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | **** Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_50.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; |
Revision as of 11:10, 29 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|