Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
* '''Thursday, Oct. 5th, Swing Shift''': | * '''Thursday, Oct. 5th, Swing Shift''': | ||
:• '''LD2 Luminosity Scan''': | :• '''LD2 Luminosity Scan''': | ||
− | ::◊ After establishing the beam in the swing shift on the inbending configuration, take the first a Møller run. | + | ::◊ After establishing the beam in the swing shift on the inbending configuration, take the first a Møller run (?; ''Check with the RC or AC after the controlled access is done''). |
::◊ Next, upon Florian's request, we will start with high-beam current runs before the low-current ones, so most experts will still be around! The purpose is to study TOF/ECAL linearity and AI training with the following beam currents and the specified trigger files but with the same DAQ configuration: | ::◊ Next, upon Florian's request, we will start with high-beam current runs before the low-current ones, so most experts will still be around! The purpose is to study TOF/ECAL linearity and AI training with the following beam currents and the specified trigger files but with the same DAQ configuration: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> |
Revision as of 12:57, 5 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 4th to Oct. 8th, 2023
P.S.: Both Denny and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|