== '''Run Plan for''' '''Oct. 5th to Oct. 8th''', 2023 == | == '''Run Plan for''' '''Oct. 5th to Oct. 8th''', 2023 == | ||
− | |||
− | |||
* '''Friday, Oct. 6th, Owl Shift''': | * '''Friday, Oct. 6th, Owl Shift''': | ||
:• Please continue watching the Solenoid temperature in Solenoid LHe - Coils or Solenoid LHe - PLC. In case of anything abnormal, please call the Hall B engineering-on-call, Morgan. Otherwise, once it reaches 5K, '''call Eugene, the RC, and the AC'''. | :• Please continue watching the Solenoid temperature in Solenoid LHe - Coils or Solenoid LHe - PLC. In case of anything abnormal, please call the Hall B engineering-on-call, Morgan. Otherwise, once it reaches 5K, '''call Eugene, the RC, and the AC'''. | ||
:• If everything looks well, Eugene will start ramping up the solenoid and torus currents, which may take 1.5h to 2h at max! | :• If everything looks well, Eugene will start ramping up the solenoid and torus currents, which may take 1.5h to 2h at max! | ||
− | :• Next, the collimator needs to be moved to a 20 mm position, | + | :• Next, the collimator needs to be moved to a 20 mm position, mask beam halos, and send the beam to FC, then take a harp scan in 2H01 and compare their results to the reference one at the bottom of this page. |
:• If everything is fine, we will resume the plan by filling the LD2 with beam OFF to perform its luminosity scan.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Day shift''-------</font></center> | :• If everything is fine, we will resume the plan by filling the LD2 with beam OFF to perform its luminosity scan.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Day shift''-------</font></center> | ||
* '''Friday, Oct. 6th, Day Shift''': | * '''Friday, Oct. 6th, Day Shift''': | ||
Line 41: | Line 39: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
::‡ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ::‡ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ||
+ | ::‡ Ask MCC for 5 nA and take a 5 M triggers run. | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_5nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | ::‡ Ask MCC for 20 nA and take a 5 M triggers run with the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_20nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | ::‡ Ask MCC for 35 nA and take a 15 M triggers run with the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
::‡ Ask MCC for 50 nA and take a 15 M triggers run with the following trigger file: | ::‡ Ask MCC for 50 nA and take a 15 M triggers run with the following trigger file: | ||
:::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font> | :::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font> | ||
Line 48: | Line 52: | ||
:::‡ Ask MCC for 100 nA, insert ''beam blocker in front of the Faraday cup'', and take a 50 M triggers run with the following trigger file: | :::‡ Ask MCC for 100 nA, insert ''beam blocker in front of the Faraday cup'', and take a 50 M triggers run with the following trigger file: | ||
::::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ::::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
::‡ '''Parasitically''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. '''Florian needs to be notified to be present in the CR during this run'''. | ::‡ '''Parasitically''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. '''Florian needs to be notified to be present in the CR during this run'''. | ||
− | ::◊ '''Parasitically to the EPICS run''', perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. | + | ::◊ '''Parasitically to the EPICS run''', perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. <font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the LD2 Lumi. scans!'' -----</font></center> |
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
:• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Swing shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | :• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Swing shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': |
Revision as of 05:58, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 5th to Oct. 8th, 2023
P.S.: Both Denny and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |