Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
:::‡ Ask MCC for 100 nA, insert ''beam blocker in front of the Faraday cup'', and take a 50 M triggers run with the following trigger file: | :::‡ Ask MCC for 100 nA, insert ''beam blocker in front of the Faraday cup'', and take a 50 M triggers run with the following trigger file: | ||
::::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease!</font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ::::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease!</font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ||
− | ::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. <font color=blue><center>-----''If everything goes well, | + | ::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. |
+ | ::◊ Once done with the Lumi. scan, remove the beam blocker and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration, but the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue> Follow the DAQ instructions below to load a new trigger file</font>.<font color=blue><center>-----''If everything goes well, that should bring us to Swing shift!''-----</font></center> | ||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel'''! | ''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel'''! |
Revision as of 13:55, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|