Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
== '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | == '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | ||
* '''Saturday, Oct. 7th, Day Shift''': | * '''Saturday, Oct. 7th, Day Shift''': | ||
− | :• | + | :• Once done, ask for 50 nA (''seems similar to LD2 @ 50 nA'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Day shift, but change the DAQ/trigger configuration to: |
− | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ::- ''DAQ Config.'': <tt> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''-----</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''-----</font></center> | ||
* '''Saturday, Oct. 7th, Swing Shift''': | * '''Saturday, Oct. 7th, Swing Shift''': | ||
Line 58: | Line 47: | ||
::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ||
::‡ Continue the luminosity scan with the specified trigger files but with the same DAQ configuration: | ::‡ Continue the luminosity scan with the specified trigger files but with the same DAQ configuration: | ||
− | :::- ''DAQ Config.'': <tt> | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
::‡ Next, we will scan three beam currents in this 5 M triggers run. Ask MCC for 110 nA, insert ''beam blocker in front of the Faraday cup'', and take roughly 1.5 M events, ''monitor the DC occupancy in mon12 and log them'', then increase the current to 120 nA, take another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 130 nA for the last 2 M events while ''monitoring and logging the DC occupancy in mon12'', but with the following trigger file: | ::‡ Next, we will scan three beam currents in this 5 M triggers run. Ask MCC for 110 nA, insert ''beam blocker in front of the Faraday cup'', and take roughly 1.5 M events, ''monitor the DC occupancy in mon12 and log them'', then increase the current to 120 nA, take another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 130 nA for the last 2 M events while ''monitoring and logging the DC occupancy in mon12'', but with the following trigger file: | ||
:::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
Line 65: | Line 54: | ||
::‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 150 nA. | ::‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 150 nA. | ||
:• Once done, ask for 130 nA (''check with RC/AC after Lumi. scan is done''), keep the ''beam blocker in front of the Faraday cup'', and take 100 M electron triggers runs of '''CuSn''' until the end of the Owl shift with the following configuration: | :• Once done, ask for 130 nA (''check with RC/AC after Lumi. scan is done''), keep the ''beam blocker in front of the Faraday cup'', and take 100 M electron triggers runs of '''CuSn''' until the end of the Owl shift with the following configuration: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. |
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
* '''Sunday, Oct. 8th, Day Shift''': | * '''Sunday, Oct. 8th, Day Shift''': | ||
Line 72: | Line 61: | ||
:•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> | :•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> | ||
:• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | :• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
:• Once done, we will switch to production mode with outbending configuration: | :• Once done, we will switch to production mode with outbending configuration: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> |
::- ''Trigger file'': '''rgd_out_v1.0.trg'''. | ::- ''Trigger file'': '''rgd_out_v1.0.trg'''. | ||
:• ''To-be-continued''.... | :• ''To-be-continued''.... |
Revision as of 13:16, 7 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|