Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 43: | Line 43: | ||
* '''Sunday, Oct. 7th, Owl Shift''': | * '''Sunday, Oct. 7th, Owl Shift''': | ||
:• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to Carbon. The previous shift leader will instruct the Owl shift expert on how to move the solid target from CuSn to CxC. For more details, please refer to the cryo-target and flag assembly [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to Carbon. The previous shift leader will instruct the Owl shift expert on how to move the solid target from CuSn to CxC. For more details, please refer to the cryo-target and flag assembly [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. | ||
− | :• | + | :•''' Since the beam was off for hours, continue data taking with CuSn whenever the beam is back until the end of the shift''' with the following configuration: |
− | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. |
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
* '''Sunday, Oct. 8th, Day Shift''': | * '''Sunday, Oct. 8th, Day Shift''': | ||
− | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with the CxC target, then switch to CuSn. | + | <!--:• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with the CxC target, then switch to CuSn.--> |
:• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | :• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | ||
− | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | + | <!--::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''.--> |
::‡ Continue the luminosity scan with the specified trigger files and the following DAQ configuration: | ::‡ Continue the luminosity scan with the specified trigger files and the following DAQ configuration: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ::‡ Ask MCC | + | ::‡ Ask MCC for 150 nA and take a 25 M triggers run with the following trigger file: |
:::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
::‡ Depending on the stability of detectors in the last CuSn higher beam currents run, we can take a 25 M run @ 170 nA with the same DAQ and trigger configurations. | ::‡ Depending on the stability of detectors in the last CuSn higher beam currents run, we can take a 25 M run @ 170 nA with the same DAQ and trigger configurations. | ||
+ | :• Once done, please call MCC to take the beam away, remove the beam blocker, and then ask for 50 nA to take 100 M triggers with CxC target until the end of the Day shift with the same DAQ and trigger configurations: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
+ | * '''Sunday, Oct. 8th, Swing Shift''': | ||
+ | :• ''To be continued and confirmed during the Day shift''! | ||
:• In case 500 M triggers are already collected for each CuSn and CxC Target, we will flip the torus magnet polarity and change the target back to the LD2 position. | :• In case 500 M triggers are already collected for each CuSn and CxC Target, we will flip the torus magnet polarity and change the target back to the LD2 position. | ||
− | |||
<!--:• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift. | <!--:• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift. | ||
* '''Sunday, Oct. 8th, Swing Shift''':--> | * '''Sunday, Oct. 8th, Swing Shift''':--> |
Revision as of 04:57, 8 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|