== '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | == '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | ||
* '''Sunday, Oct. 8th, Swing Shift''': | * '''Sunday, Oct. 8th, Swing Shift''': | ||
− | :• | + | :• If the controlled access is done and the beam is back, please ask MCC for 130 nA and take one 100 M production run of the CuSn target with the following configuration: |
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
Line 45: | Line 45: | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ||
* '''Monday, Oct. 9th, Owl Shift''': | * '''Monday, Oct. 9th, Owl Shift''': | ||
− | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to Carbon target with beam | + | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to the Carbon target with beam OFF by just changing the solid target from the drop-menu in the croyotarget GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. |
:• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | :• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
* '''Monday, Oct. 9th, Day Shift''': | * '''Monday, Oct. 9th, Day Shift''': | ||
− | :• It depends on the run status in the changeover, but in case it's not ended, please continue the run until it reaches 100 M with CxC target, then switch to CuSn with beam OFF by just changing the solid target from the drop-menu in the croyotarget GUI. For more details, please refer to the cryo-target and flag assembly. | + | :• It depends on the run status in the changeover, but in case it's not ended, please continue the run until it reaches 100 M with CxC target, then switch to the CuSn target with beam OFF by just changing the solid target from the drop-menu in the croyotarget GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. |
:• Continue CuSn data-taking with 100 M production runs and the following DAQ and trigger configurations until the end of the Day shift: | :• Continue CuSn data-taking with 100 M production runs and the following DAQ and trigger configurations until the end of the Day shift: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
Revision as of 15:04, 8 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q asymmetry
|
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|