− | == '''Run Plan for''' '''Oct. | + | == '''Run Plan for''' '''Oct. 8th to Oct. 9th''', 2023 == |
* '''Sunday, Oct. 8th, Swing Shift''': | * '''Sunday, Oct. 8th, Swing Shift''': | ||
:• If the controlled access is done and the beam is back, please ask MCC for 130 nA and take one 100 M production run of the CuSn target with the following configuration: | :• If the controlled access is done and the beam is back, please ask MCC for 130 nA and take one 100 M production run of the CuSn target with the following configuration: | ||
Line 47: | Line 47: | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ||
* '''Monday, Oct. 9th, Owl Shift''': | * '''Monday, Oct. 9th, Owl Shift''': | ||
− | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to the | + | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to the CxC target with beam OFF by changing the solid target from the drop-menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. |
:• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | :• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
* '''Monday, Oct. 9th, Day Shift''': | * '''Monday, Oct. 9th, Day Shift''': | ||
− | :• It depends on the run status in the changeover, but in case it's not ended, please continue the run until it reaches 100 M with CxC target, then switch to the CuSn target with beam OFF by | + | :• It depends on the run status in the changeover, but in case it's not ended, please continue the run until it reaches 100 M with CxC target, then switch to the CuSn target with beam OFF by changing the solid target from the drop-menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. |
:• Continue CuSn data-taking with 100 M production runs and the following DAQ and trigger configurations until the end of the Day shift: | :• Continue CuSn data-taking with 100 M production runs and the following DAQ and trigger configurations until the end of the Day shift: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
Revision as of 15:24, 8 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ As of Oct. 8th Swing shift, the S2 Drift Chambers HV was turned OFF until the investigation is done with the related gas system behavior.
Run Plan for Oct. 8th to Oct. 9th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q asymmetry
|
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|