Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 111: | Line 111: | ||
* Tagger (2C24A [https://logbooks.jlab.org/entry/4191955]; x= -2.0 mm; y= +0.6 mm | * Tagger (2C24A [https://logbooks.jlab.org/entry/4191955]; x= -2.0 mm; y= +0.6 mm | ||
− | === IA for Q | + | === IA for Q Asymmetry === |
* HWP IN: https://logbooks.jlab.org/entry/4194811 and https://logbooks.jlab.org/entry/4195453 | * HWP IN: https://logbooks.jlab.org/entry/4194811 and https://logbooks.jlab.org/entry/4195453 | ||
− | * HWP OUT: | + | * HWP OUT: https://logbooks.jlab.org/entry/4195738 and https://logbooks.jlab.org/entry/4195733 |
| valign=top | | | valign=top | | ||
+ | |||
==<font color=blue>''' General Instructions''':</font>== | ==<font color=blue>''' General Instructions''':</font>== | ||
Revision as of 21:47, 8 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ As of Oct. 8th Swing shift, the S2 Drift Chambers HV of R1 & R2 are turned OFF until the investigation is done with the related gas behavior!.
Run Plan for Oct. 8th to Oct. 9th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|