Line 39: | Line 39: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ||
− | * '''Thursday, Oct. 12th, | + | * '''Thursday, Oct. 12th, Owl Shift''': |
:• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | :• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
+ | * '''Thursday, Oct. 12th, Day Shift''': | ||
+ | :• Depending on the status of the run during the changeover, please end the run once it reaches 100 M, then start the RICH threshold scans. | ||
+ | :• Please ask MCC for 35 nA and take three 1h 30min runs with BEAM-ON and the following DAQ configuration: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
+ | but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | ||
+ | ::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_50.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | ||
+ | ::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_100.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | ||
+ | ::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_200.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run. | ||
* '''Friday, Oct. 13th, Owl Shift''': | * '''Friday, Oct. 13th, Owl Shift''': | ||
:• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | :• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: |
Revision as of 19:26, 11 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ For the required controlled access to change the LD2 and solid targets position down in the hall, please refer to this logbook entry #: 419613 for its requirement.
- ◊ Do NOT change FSD settings without approval from RC or beamline expert!
Run Plan for Oct. 11th to Oct. 13th, 2023
but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, please check with the RC/AC:
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|