Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 51: | Line 51: | ||
::‡ Ask MCC for 50 nA and take a 25 M triggers run with the following trigger file: | ::‡ Ask MCC for 50 nA and take a 25 M triggers run with the following trigger file: | ||
:::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
− | :• Once done, please take another one hour trigger validation run at 35 nA with the following configuration: | + | :• Once done, please take another one-hour trigger validation run at 35 nA with the following configuration: |
::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v2.0_no_DC.trg'''. | ::- ''Trigger file'': '''rgd_v2.0_no_DC.trg'''. | ||
− | :• Then, continue the LD2 outbending production with | + | :• Once done, please take another one-hour trigger validation run at 35 nA with the following configuration: |
+ | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
+ | ::- ''Trigger file'': '''rgd_v2.1_no_DC.trg'''. | ||
+ | :• Then, continue the LD2 outbending production with 50 nA and 100 M runs by using the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font> | ||
* '''Friday, Oct. 13th, Swing Shift''': | * '''Friday, Oct. 13th, Swing Shift''': | ||
− | :• Continue the LD2 outbending production with | + | :• Continue the LD2 outbending production with 50 nA and 100 M runs by using the following configuration: |
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> |
Revision as of 14:12, 13 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540 (or 757-223-6213)
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Current Issues
- If new hot channels appear in BMT/FMT/SVT, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- If the tagger magnet needs to be turned off, tell the operator to use only the script only for degaussing, NEVER do "by hand"!
- In case of questions from MCC about the necessary controlled access to change the LD2 and solid targets positions in the hall, please refer to the logbook entry #: 4196113 for the access requirements.
Run Plan for Oct. 13th to Oct. 14th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|