* The <b> main lights in the Hall </b> (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights, when switched off, cannot be turned back on immediately because they require 10-15 min to cool down. Now we have a new dome light switch outside of the hall in the labyrinth. The lights can be turned off without entering the hall. | * The <b> main lights in the Hall </b> (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights, when switched off, cannot be turned back on immediately because they require 10-15 min to cool down. Now we have a new dome light switch outside of the hall in the labyrinth. The lights can be turned off without entering the hall. |
Revision as of 20:40, 15 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540 (or 757-223-6213)
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- BMT/FMT/SVT
- If new hot channels appear, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- SVT low voltage alarms (minor) is a communication problem in the system, not an issue with the voltages. Acknowledge the alarm.
- Until further notice, please ignore for now the empty six sectors "ECAL_adcSum" in mon12 histograms as that is under investigation to be either fixed or removed.
- If the tagger magnet needs to be turned off, tell the operator to use only the script only for degaussing, NEVER do "by hand"!
- In case of questions from MCC about the necessary controlled access to change the LD2 and solid targets positions in the hall, please refer to the logbook entry #: 4196113 for the access requirements.
Run Plan for Fr., Oct 13 - We., Oct 18, 2023Production on CxC target
DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions
Every Shift:
Every Run:
To access the Hall:
|