== '''Run Plan''' for Mon., Oct. 31<sup>st</sup> - Sat., Nov. 11<sup>th</sup>, 2023 == | == '''Run Plan''' for Mon., Oct. 31<sup>st</sup> - Sat., Nov. 11<sup>th</sup>, 2023 == | ||
− | * | + | * Continue LD2 production as follows: |
− | |||
− | |||
− | |||
:- Beam current: '''60 nA''' | :- Beam current: '''60 nA''' | ||
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
Line 61: | Line 58: | ||
* '''Wednesday, Nov. 1<sup>st</sup>, Day Shift''': | * '''Wednesday, Nov. 1<sup>st</sup>, Day Shift''': | ||
− | :• MCC Beam Studies! The hall will be in Controlled Access. '''Beam down for Hall B at 8:30''' | + | :• MCC Beam Studies! The hall will be in Controlled Access. '''Beam down for Hall B at 8:30 AM.''' |
:• '''Please call the engineering on-call to change the target position in the hall to the solid target position. | :• '''Please call the engineering on-call to change the target position in the hall to the solid target position. | ||
Line 67: | Line 64: | ||
:• '''Once the target work is done, change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start emptying the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | :• '''Once the target work is done, change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start emptying the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | ||
− | * '''Wednesday, Nov. 1<sup>st</sup>, Swing Shift''': | + | * '''Wednesday, Nov. 1<sup>st</sup>, Swing Shift''': |
− | :& | + | :• Beam restoration: Please review the {{#switchtablink:General_How-to|General How-to}} tab instructions to: |
− | :& | + | ::◊ Establish the physics beam to the tagger dump; |
− | :& | + | ::◊ Take a Møller run (with a 1/2-wave plate OUT and the new Wien Angle); |
− | :• If everything is fine, please insert CuSn back in the beamline | + | ::◊ Establish the physics beam to the Faraday Cup. |
+ | |||
+ | :• If everything is fine, please insert CuSn back in the beamline along the beam blocker. Resume CuSn data-taking as follows: | ||
<!--* Continue production on CuSn target as follows:--> | <!--* Continue production on CuSn target as follows:--> | ||
:- Target: '''CuSn''' | :- Target: '''CuSn''' | ||
:- Beam Blocker: '''IN''' | :- Beam Blocker: '''IN''' | ||
− | :- Beam current: ''' | + | :- Beam current: '''95 nA +/- 3nA on 2C21A''' |
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
:- DAQ configuration: <tt>'''PROD67'''</tt> | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
:- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
− | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=brown>'''P.S.: If the beam is widely fluctuating above | + | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=brown>'''P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!'''</font></p></span> |
<!-- | <!-- | ||
** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> | ** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> |
Revision as of 19:44, 31 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (eg due to fire alarm in Counting House) grab the shift expert phone and call the RC from outside. RC will call MCC: Take beam down for Hall B.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions.
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- Do not spend more than 15-20 min trying to fix a problem. With any issue, contact On-Call Experts or RC.
- NEW: when starting a new run after successful end, do not go from Prestart, but Abort and then Download, Prestart, Go
- Especially after HWP change, check the SLM and FCUP charge asymmetry (Q-Asym on Beamline Overview), the absolute values should be less than 0.1%. If they are out of range, contact the beamline expert.
- NOTE, the beam position on BPM 2C21A is not important during production, the beam orbit lock is on BPM 2H01.
- RICH:
- New RICH recovery protocol: see tab expert "Shift Expert" for new information. Avoid unnecessary recoveries.
- RICH Sector 1 has three missing tiles, this is known, no action by shift required.
- BMT/FMT/SVT: If new hot channels appear, call the MVT/SVT/MM expert Yuri Gotra (757-541-7539). These channels need to be addressed by the expert.
- Tagger magnet procedure: If the tagger magnet needs to be turned off, tell the operator to use only the script for degaussing, NEVER do "by hand"!
- Change of target in the hall: In case of questions from MCC about the necessary controlled access, refer to the logbook entry #: 4196113 for the access requirements.
Run Plan for Mon., Oct. 31st - Sat., Nov. 11th, 2023
P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination! DAQ Operation
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions
|