Difference between revisions of "Template:ShortTermSchedule-RGK"
Jump to navigation
Jump to search
Line 62: | Line 62: | ||
::: - Use nominal DC HV setting (10, 11, 11) | ::: - Use nominal DC HV setting (10, 11, 11) | ||
::: - For each beam current put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ::: - For each beam current put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ||
− | :: 08:00 – | + | :: 08:00 – 24:00 - DC test plan part I (<font color="red">Florian Hauenstein</font>) (PROD67_PIN configuration) |
::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ||
:::: - The first 75M event run will use the nominal DC settings. Start run and call DC expert (Florian) when it gets to 50M. | :::: - The first 75M event run will use the nominal DC settings. Start run and call DC expert (Florian) when it gets to 50M. | ||
::: - Collect data for gain calibration CTOF, ECAL, FTOF, HTCC | ::: - Collect data for gain calibration CTOF, ECAL, FTOF, HTCC | ||
− | ::: - For each HV setting put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | + | ::: - For each HV setting put mon12 plots in logbook. The first will use the nominal DC normalized occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off |
− | ::: - For each HV setting post plots to HBLOG of DC HV currents (all Regions) and "DC HV measured current and voltage" screen (see DC HV, under monitoring button) | + | ::: - For each HV setting post plots to HBLOG of DC HV currents (all Regions) and "DC HV measured current and voltage" screen (see DC HV, under monitoring button) (see last night's logbook for the full set) |
− | |||
− | |||
*'''Sunday, Dec. 17''': | *'''Sunday, Dec. 17''': | ||
− | :: 00:00 – 08:00 – Data collection (shifters) (rgk_noDC_v1. | + | :: 00:00 – 08:00 – Data collection (shifters) (rgk_noDC_v1.0_300MeV.trg, PROD67 configuration) |
− | ::: - | + | ::: - Use DC (10 11 11) setting (Florian will set the DC HV) |
+ | ::: - Take one 4-hr run with 75 nA | ||
+ | ::: - Take one 4-hr run with 90 nA | ||
:: 08:00 – 11:00 – Streaming readout tests (<font color="red">Sergey Boyarinov</font>, <font color="red">David Lawrence</font>) | :: 08:00 – 11:00 – Streaming readout tests (<font color="red">Sergey Boyarinov</font>, <font color="red">David Lawrence</font>) | ||
− | ::: - | + | ::: - Turn off all detectors except FTOF and ECAL; Consult Yuri for SVT and CVT settings. |
+ | ::: - Runs up to 150 nA | ||
:: 11:00 – 22:00 – DC test plan part II (<font color="red">Florian Hauenstein</font>) (use PROD67_PIN configuration) | :: 11:00 – 22:00 – DC test plan part II (<font color="red">Florian Hauenstein</font>) (use PROD67_PIN configuration) | ||
::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ||
Line 81: | Line 82: | ||
::: - For each HV setting post plots to HBLOG of DC HV currents (all Regions) and "DC HV measured current and voltage" screen (see DC HV, under monitoring button) | ::: - For each HV setting post plots to HBLOG of DC HV currents (all Regions) and "DC HV measured current and voltage" screen (see DC HV, under monitoring button) | ||
:: 22:00 – 24:00 – Data collection (shifters) (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | :: 22:00 – 24:00 – Data collection (shifters) (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ||
− | ::: - Use | + | ::: - Use DC (10 11 11) setting (Florian will set the DC HV) |
+ | ::: - Take one 4-hr run with 60 nA | ||
+ | ::: - Take one 4-hr run with 75 nA | ||
*'''Monday, Dec. 18''': | *'''Monday, Dec. 18''': | ||
:: 00:00 – 08:00 – Data collection cont’d (shifters) (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | :: 00:00 – 08:00 – Data collection cont’d (shifters) (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ||
− | ::: - Use | + | ::: - Use DC (10 11 11) setting (Florian will set the DC HV) |
+ | ::: - Take one 4-hr run with 60 nA | ||
+ | ::: - Take one 4-hr run with 75 nA | ||
:: 08:00 – 14:00 – Reverse solenoid polarity (<font color="red">Eugene Pasyuk</font>, <font color="red">Engineering</font>) | :: 08:00 – 14:00 – Reverse solenoid polarity (<font color="red">Eugene Pasyuk</font>, <font color="red">Engineering</font>) | ||
:: 14:00 – 17:00 – Trigger validation (<font color="red">Valery Kubarovsky</font>) (use PROD67_PIN configuration) | :: 14:00 – 17:00 – Trigger validation (<font color="red">Valery Kubarovsky</font>) (use PROD67_PIN configuration) | ||
::: - Complete trigger validation test plans with DAQ ([https://wiki.jlab.org/clas12-run/images/a/a6/RGK_trigger.pdf RG_K trigger details]) | ::: - Complete trigger validation test plans with DAQ ([https://wiki.jlab.org/clas12-run/images/a/a6/RGK_trigger.pdf RG_K trigger details]) | ||
− | :: 17:00 – 24:00 – Data collection (shifters) ( | + | :: 17:00 – 24:00 – Data collection (shifters) (PROD67 configuration) |
− | ::: - Use | + | ::: - Use DC (10 11 11) setting (Florian will set the DC HV) |
+ | ::: - Take one 4-hr run with 60 nA (rgk_noDC_v1.0_300MeV.trg) | ||
+ | ::: - Take one 4-hr run with 75 nA (rgk_noDC_v1.0_300MeV.trg) | ||
+ | ::: - Take one 4-hr run with 60 nA (rgk_noDC_v1.0_200MeV.trg) | ||
+ | ::: - Take one 4-hr run with 75 nA (rgk_noDC_v1.0_200MeV.trg) | ||
*'''Tuesday, Dec. 19''': | *'''Tuesday, Dec. 19''': | ||
− | :: 00:00 – 07:00 – Data collection cont’d (shifters) (rgk_noDC_v1.0_200MeV.trg | + | :: 00:00 – 07:00 – Data collection cont’d (shifters) |
− | ::: - | + | ::: - Use DC (10 11 11) setting (Florian will set the DC HV) |
+ | ::: - Take one 4-hr run with 60 nA (rgk_noDC_v1.0_300MeV.trg) | ||
+ | ::: - Take one 4-hr run with 75 nA (rgk_noDC_v1.0_300MeV.trg) | ||
+ | ::: - Take one 4-hr run with 60 nA (rgk_noDC_v1.0_200MeV.trg) | ||
+ | ::: - Take one 4-hr run with 75 nA (rgk_noDC_v1.0_200MeV.trg) | ||
:: 07:00 – Beam off | :: 07:00 – Beam off | ||
:: 07:00 – 08:00 – Prepare CLAS12 for accelerator down | :: 07:00 – 08:00 – Prepare CLAS12 for accelerator down |
Revision as of 14:23, 16 December 2023
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Bill Briscoe (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Friday, Dec. 15 - Tuesday, Dec. 19, 2023
|
General Instructions
|
DAQ Operation & Related General Instructions
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-K
- Tagger (2C24A) [3]: x= -2.0 mm; y= +0.6 mm
- 2C21A [4]: x= -0.4 mm; y= +0.6 mm
- 2H01 [5]; x= -1.4 mm; y= 0.0 mm