Line 41: | Line 41: | ||
:: 08:00 – 13:00: Hall B in Controlled Access | :: 08:00 – 13:00: Hall B in Controlled Access | ||
::: - ACC completes change from 5-pass to 3-pass beam | ::: - ACC completes change from 5-pass to 3-pass beam | ||
− | ::: - Target Group completes change from LD2 to LH2 target (Chris Keith, James Brock) | + | ::: - Target Group completes change from LD2 to LH2 target (<font color="red">Chris Keith</font>, <font color="red">James Brock</font>) |
:: 13:00 – 16:00 – Beam tuning + Moller run | :: 13:00 – 16:00 – Beam tuning + Moller run | ||
− | ::: - Tune beam to tagger dump yoke with necessary harp scans (Eugene Pasyuk) | + | ::: - Tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) |
− | ::: - Take three Moller runs, one with each target polarization direction, flip HWP and take another run (Nathan Baltzell) | + | ::: - Take three Moller runs, one with each target polarization direction, flip HWP and take another run (<font color=red>Nathan Baltzell</font>) |
− | ::: - Tune beam to Faraday cup with empty target (Eugene Pasyuk) | + | ::: - Tune beam to Faraday cup with empty target (<font color="red">Eugene Pasyuk</font>) |
− | ::: - Fill LH2 target (Chris Keith, James Brock) | + | ::: - Fill LH2 target (<font color="red">Chris Keith</font>, <font color="red">James Brock</font>) |
− | :: 16:00 – 21:00 – Trigger validation (Valery Kubarovsky) (i) rgk_noDC_v1.0_validation, ii) rgk_v1.0_30kHz_150MeV, PROD67_PIN configuration) | + | :: 16:00 – 21:00 – Trigger validation (<font color="red">Valery Kubarovsky</font>) (i) rgk_noDC_v1.0_validation, ii) rgk_v1.0_30kHz_150MeV, PROD67_PIN configuration) |
::: - Use nominal DC HV setting (10, 11, 11) | ::: - Use nominal DC HV setting (10, 11, 11) | ||
::: - Complete trigger validation test plans with DAQ ([https://wiki.jlab.org/clas12-run/images/a/a6/RGK_trigger.pdf RG_K trigger details]) | ::: - Complete trigger validation test plans with DAQ ([https://wiki.jlab.org/clas12-run/images/a/a6/RGK_trigger.pdf RG_K trigger details]) | ||
Line 62: | Line 62: | ||
::: - Use nominal DC HV setting (10, 11, 11) | ::: - Use nominal DC HV setting (10, 11, 11) | ||
::: - For each beam current put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ::: - For each beam current put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ||
− | :: 08:00 – 24:00 - DC test plan part I (Florian Hauenstein) (PROD67_PIN configuration) | + | :: 08:00 – 24:00 - DC test plan part I (<font color="red">Florian Hauenstein</font>) (PROD67_PIN configuration) |
::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ||
:::: - The first 75M event run will use the nominal DC settings. Start run and call DC expert (Florian) when it gets to 50M. | :::: - The first 75M event run will use the nominal DC settings. Start run and call DC expert (Florian) when it gets to 50M. | ||
Line 71: | Line 71: | ||
*'''Sunday, Dec. 17''': | *'''Sunday, Dec. 17''': | ||
:: 00:00 – 08:00 – Data collection (rgk_noDC_v1.0_300MeV.trg, PROD67 configuration) | :: 00:00 – 08:00 – Data collection (rgk_noDC_v1.0_300MeV.trg, PROD67 configuration) | ||
− | ::: - Use DC (10 11 11) setting | + | ::: - Use DC (10 11 11) setting |
::: - Take one 4-hr run with 75 nA | ::: - Take one 4-hr run with 75 nA | ||
::: - Take one 4-hr run with 90 nA | ::: - Take one 4-hr run with 90 nA | ||
− | :: 08:00 – 11:00 – Streaming readout tests (Sergey Boyarinov, David Lawrence)) ([https://wiki.jlab.org/epsciwiki/images/f/f0/SRO_LDRD_Test_Plan_2024v0.5.pdf Streaming readout test plan document]) | + | :: 08:00 – 11:00 – Streaming readout tests (<font color="red">Sergey Boyarinov</font>, <font color="red">David Lawrence</font>)) ([https://wiki.jlab.org/epsciwiki/images/f/f0/SRO_LDRD_Test_Plan_2024v0.5.pdf Streaming readout test plan document]) |
::: - Turn off all detectors except FTOF and ECAL; Consult Yuri for SVT and CVT settings. | ::: - Turn off all detectors except FTOF and ECAL; Consult Yuri for SVT and CVT settings. | ||
::: - Runs up to 150 nA | ::: - Runs up to 150 nA | ||
:: 11:00 - 13:30 - Work on LH2 target | :: 11:00 - 13:30 - Work on LH2 target | ||
− | :: 13:30 – 20:00 – DC test plan part II (Florian Hauenstein) (use PROD67_PIN configuration) | + | :: 13:30 – 20:00 – DC test plan part II (<font color="red">Florian Hauenstein</font>) (use PROD67_PIN configuration) |
::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ::: - DC HV studies at 40 nA (75M trigger runs) ([https://wiki.jlab.org/clas12-run/images/e/e7/DCplansRGK.pdf DC test plan document]) | ||
::: - For each HV setting put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ::: - For each HV setting put mon12 plots in logbook. The first will use the nominal DC occupancy z-scale (10%), the second should have the scale set appropriately for each current to prevent cut off | ||
Line 84: | Line 84: | ||
::: - The remainder of the plan has 4 DC settings to study: (10,11,12), (12,13,13), (11,11,11), (10,12,10) | ::: - The remainder of the plan has 4 DC settings to study: (10,11,12), (12,13,13), (11,11,11), (10,12,10) | ||
:: 20:00 – 24:00 – Data collection | :: 20:00 – 24:00 – Data collection | ||
− | ::: - Use DC (10 11 11) setting | + | ::: - Use DC (10 11 11) setting |
::: - Take one 3-hr run with 60 nA (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ::: - Take one 3-hr run with 60 nA (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ||
::: - Take one 3-hr run with 75 nA (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ::: - Take one 3-hr run with 75 nA (rgk_noDC_v1.0_200MeV.trg, PROD67 configuration) | ||
Line 94: | Line 94: | ||
:: 00:00 – 07:30 – Data collection cont’d | :: 00:00 – 07:30 – Data collection cont’d | ||
::: See previous step | ::: See previous step | ||
− | :: 07:30 – 15:30 – Reverse solenoid polarity (Eugene Pasyuk, Engineering) | + | :: 07:30 – 15:30 – Reverse solenoid polarity (<font color="red">Eugene Pasyuk</font>, Engineering) |
::: - At 07:30 end run, call Eugene Pasyuk to ramp down solenoid and call for Controlled Access | ::: - At 07:30 end run, call Eugene Pasyuk to ramp down solenoid and call for Controlled Access | ||
::: - The Magnet Group will be in Counting House at 08:30 | ::: - The Magnet Group will be in Counting House at 08:30 |
Revision as of 07:01, 19 December 2023
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Bill Briscoe (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Friday, Dec. 15 - Tuesday, Dec. 19, 2023
|
General Instructions
|
DAQ Operation & Related General Instructions
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-K
- 2C21A [3]: x= -0.4 mm; y= +0.6 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2H01 [5]; x= -1.4 mm; y= 0.0 mm