Line 41: | Line 41: | ||
::: - Turn all CLAS12 detectors off; SVT HV off, LV on; BMT HV safe mode, LV on | ::: - Turn all CLAS12 detectors off; SVT HV off, LV on; BMT HV safe mode, LV on | ||
::: - Ask MCC to energize tagger magnet, blank collimator in | ::: - Ask MCC to energize tagger magnet, blank collimator in | ||
+ | ::: - Ask MCC to <font color="red">mask Solenoid FSD</font> | ||
::: - Follow procedures to tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ::: - Follow procedures to tune beam to tagger dump yoke with necessary harp scans (<font color="red">Eugene Pasyuk</font>) | ||
::: - Take Moller run at 20 nA (default settings; polarity positive, left target) (<font color="red">Nathan Baltzell</font>) | ::: - Take Moller run at 20 nA (default settings; polarity positive, left target) (<font color="red">Nathan Baltzell</font>) | ||
Line 69: | Line 70: | ||
:: 15:00 – 18:00 - Prepare for production running | :: 15:00 – 18:00 - Prepare for production running | ||
::: - Ramp up the torus (-100%) and the solenoid (100% POSITIVE polarity) (<font color="red">Eugene Pasyuk</font>) | ::: - Ramp up the torus (-100%) and the solenoid (100% POSITIVE polarity) (<font color="red">Eugene Pasyuk</font>) | ||
+ | ::: - Once the Solenoid current is above 1000 A ask MCC to <font color="red">unmask Solenoid FSD</font> | ||
::: - Fill the target (<font color="red">James Brock</font>) | ::: - Fill the target (<font color="red">James Brock</font>) | ||
:: 18:00 – 21:00 - Production running | :: 18:00 – 21:00 - Production running |
Revision as of 10:58, 11 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Axel Schmidt (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- The BPM 2H01 needs time for the temperature to stabilize before it can be tuned. Until it is tuned, its value and the beam orbit lock which relies on it, will not be valid. The orbit lock should remain OFF until the BPM is tuned, expected Fri. Jan 12 AM.
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- Arrive at least 10 minutes early for shift change;
- Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- Important links
- Recent Changes and Current Issues Needs updating
- General How-to for beam restoration procedures and Møller runs.
Run Plan, Thursday, Jan. 11 - Saturday, Jan. 13, 2024
|
General Information
|
DAQ Operation & Related General Information
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time