Difference between revisions of "Recent Changes and Current Issues"

From clas12-run
Jump to navigation Jump to search
Line 28: Line 28:
  
 
* '''DC''':
 
* '''DC''':
** Shifters should make sure to log every DC trip in a logbook post. Make sure to list WHERE the trip occured.
+
** Make sure to log every DC trip in the shift summary. Make sure to list WHERE and why, possibly, the trip occurred.
  
 
* '''ECAL/PCAL:'''
 
* '''ECAL/PCAL:'''

Revision as of 14:26, 17 January 2024

Recent Changes

  • To make a logbook entry of the strip charts, right-click somewhere on a blank area in any one of the charts. Un-click ELOG and select HBLOG and submit. The title of the logbook entry can be changed.
  • Controlled Access to the Hall:
• After 60-75 nA beam current, we ask MCC to stop the beam down, wait for the beacon to stop flashing (15-20 minutes), and then do not need an escort to go in.
• After 95 nA beam current or a Moller run, the beacon will not stop flashing anytime soon, so we need escorted access, viz the ARM. In that case, we can keep the beam until the ARM arrives at the Counting House.
  • ZOOM:
• To keep the 24-7 ZOOM session running in the Counting House, 1) click on https://jlab-org.zoomgov.com/j/1618614939, included on "Remote Shifts" under the runwiki Shift Worker tab, 2) choose the option to "join from browser" (Chrome is recommended) and ignore all other messages to update the ZOOM APP in the pop-up windows, and 3) enter the passcode from the logbook entry in the runwiki Shift Worker tab.

Current Issues

  • Beamline:
    • After the HWP change, check the SLM and FCUP charge asymmetry (Q-Asym on Beamline Overview) as the absolute values should be less than 0.1%. If they are out of range, contact the Beamline Expert.
    • The beam position on BPM 2C21A is not essential during production; the beam orbit lock is on BPM 2H01. We want both, 2C24A and 2H01 to have our nominal beam positions.
    • Tagger Magnet Procedure: If the tagger magnet needs to be turned off, tell the operator to ONLY use the script for degaussing, NEVER do it "by hand"! The latter method might/will trip the circuit breaker for the power supply in the Hall.
  • BMT/SVT:
    • If new hot channels appear, call the SVT/MM expert Yuri Gotra (757-541-7539). These channels need to be addressed by the expert.
    • BMT HV trips: no screenshots are necessary, power-cycle the channel HV as fast as possible (the underlying script will take care of ramping it up), note the trip and sector/layer in the shift summary. If the same channel trips frequently, ask the expert on call for guidance.
    • BMT S1L5 strip is OFF
  • DAQ:
    • Some ROCs keep printing error messages while functioning properly; please see their list in this logbook entry # 4215299 to avoid unnecessary reboots since the printout in the ROC terminal won't change. The message will appear in the DAQ run control if they get disconnected!
  • DC:
    • Make sure to log every DC trip in the shift summary. Make sure to list WHERE and why, possibly, the trip occurred.
  • ECAL/PCAL:
  • RICH:
    • RICH Sector 1 has three missing tiles; this is known, and no action is required from the shifters.
    • In case of a RICH issue (e.g, missing tiles), a screenshot of both scalers and temperatures should be logged in the RICH logbook before running the appropriate recovery.