Difference between revisions of "Template:ShortTermSchedule-RGK"
Line 168: | Line 168: | ||
|} | |} | ||
− | === Harp Scan References | + | === Harp Scan References === |
* Tagger (2C24A) | * Tagger (2C24A) |
Revision as of 22:03, 17 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- Arrive at least 10 minutes early for shift change;
- Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- Important links
- Tab Recent Changes and Current Issues
- General How-to for beam restoration procedures and Møller runs.
Run Plan Wednesday, Jan. 17 - 18, 2024HWP OUT Beam Restoration
Trigger Tests
Production
|
General InformationThe main lights in the Hall (dome lights) and the Forward Carriage lights must be OFF because of light leaks. If these lights are switched on during an access, they should be switched off when leaving the Hall.
Beamline:
Detector HV OFF for beam tuning and Møller runs
Access to the Hall:
|
DAQ Operation & Related General Information
NEW STANDARD end and start of the run:
This will ensure proper compression of the FADCs and therefore a smaller data rate. Restart DAQ when changing configuration or trigger files, when the run did not end correctly, when ROCs are rebooted, or after RICH recovery:
|
|
Triggers files
rgk_noDC_v1.0_300MeV.trg | DC roads are not in the trigger. Hold off time is 3 us. |
rgk_noDC_v1.1_300MeV.trg | DC roads are not in the trigger. Hold off time is 2 us. |
rgk_noDC_v1.2_300MeV.trg | DC roads are not in the trigger. Hold off time is 1 us. |
rgk_out_v1.1_300MeV.trg | Outbending DC roads, Hold off time is 2 us. |
Reference Values
FSD Thresholds
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Nominal Beam Positions
BPM | mm | |
---|---|---|
2C24A | x | -1.7 |
y | +0.5 | |
2H01 | x | -0.7 |
y | +0.6 | |
2C21A | x | -0.4 |
y | +0.7 |
Harp Scan References
- Tagger (2C24A)
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238887
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238638 x= -2.0 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238622
- 2H01
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238889
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238673 x= -1.1 mm; y= 0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4234764
- 2C21A
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238636 x= -0.4 mm; y= +0.6 mm
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238636
To Do Items
- Faraday Cup Calibration
- Rafo can use beam current scan taken from Sat. Jan. 13, during 13:50 - 14:20
- Empty target running (with full field)
- Goal is to take > 5% integrated charge, but not until about 2 weeks in
- Prescale on FC cup trigger
- Discuss when to study after we have a plan for Tuesday Jan. 16 down time