Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30.
Do NOT change FSD settings without approval from RC or beamline expert!
Line 29: | Line 29: | ||
* The main lights in the Hall and the Forward Carriage lights must be kept off during data taking. | * The main lights in the Hall and the Forward Carriage lights must be kept off during data taking. | ||
** Refer to these reference photos, [https://logbooks.jlab.org/entry/3825712 ON] and [https://logbooks.jlab.org/entry/3825731 OFF] | ** Refer to these reference photos, [https://logbooks.jlab.org/entry/3825712 ON] and [https://logbooks.jlab.org/entry/3825731 OFF] | ||
− | ** We have a new dome light switch outside of the hall in the labyrinth | + | ** We have a new dome light switch outside of the hall in the labyrinth, so they can now [https://logbooks.jlab.org/entry/4204460 turned off without entering the Hall]. |
− | |||
* Beamline | * Beamline |
Revision as of 12:05, 26 February 2024
Run Coordinator: Hayk Hakyoban (757) 575-7540
PDL: Nathan Baltzell (9-) 757 876-1789; Office: x5902
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Monday, March 10 - Monday, Dec. 4
|
General Reminders
|
|
|
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [1]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [2]: x= -2.0 mm; y= +0.6 mm
- 2C21A [3]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)