Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1602110826; Passcode: 650675), except on Wednesdays, which is on ZOOM ONLY @ 15:30.
Line 23: | Line 23: | ||
** If the beam profile and the position (standard deviation and the mean values of the Gaussian fits) are close to the previous tune, ask to take the beam away to prepare for the Moller run. Otherwise, work with MCC OPS to correct beam profiles and positions. | ** If the beam profile and the position (standard deviation and the mean values of the Gaussian fits) are close to the previous tune, ask to take the beam away to prepare for the Moller run. Otherwise, work with MCC OPS to correct beam profiles and positions. | ||
* Preparing for the Moller run: | * Preparing for the Moller run: | ||
− | ** take the beam away, | + | ** take the beam away, orbit locks OFF, |
− | ** | + | ** Open the Moller GUI, and follow the instructions to configure the Moller polarimeter, |
+ | ** When ready, ask for a 20 nA beam and start the run. Make sure the ACC/Coinc ratio is <0.1 and the charge asymmetry is <0.2%. If the charge asymmetry is more than 0.2%, call the beamline expert (Eugene), | ||
** repeat the Moller run with with revered Helmholtz field. | ** repeat the Moller run with with revered Helmholtz field. | ||
* After Moller runs are complete: | * After Moller runs are complete: | ||
Line 31: | Line 32: | ||
** ask MCC to send a 5 nA beam to the Faraday cup when ready. | ** ask MCC to send a 5 nA beam to the Faraday cup when ready. | ||
** Remind MCC about our BPM positions; see the right side of this page. Ensure the upstream and midstream halo counter rates are ~<10s Hz. | ** Remind MCC about our BPM positions; see the right side of this page. Ensure the upstream and midstream halo counter rates are ~<10s Hz. | ||
− | ** | + | ** Set the FSD to harp scan mode - trip limits 1 MHz, dwell time 50 ms, and perform 2H01 harp scan with 5 nA beam, |
** compare it with the nominal pone posted on this page. If all is well, prepare for data taking. | ** compare it with the nominal pone posted on this page. If all is well, prepare for data taking. | ||
* Remove the beam and start turning the detectors on. In the meantime, move the solid target to the Pb (lead) position and fill the cryo target (which may take an hour). | * Remove the beam and start turning the detectors on. In the meantime, move the solid target to the Pb (lead) position and fill the cryo target (which may take an hour). |
Revision as of 12:31, 2 April 2024
Run Coordinator: Stepan Stepanyan (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Tuesday, April 2
Production data taking
In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. LD2+Pb runs
For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 Long term run plan [1] |
ReferencesBPM Positions
Harp ScansFSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!
Charge Asymmetry |
General Reminders
|
DAQ Operation
|