Difference between revisions of "Template:ShortTermSchedule-RGE"
Line 11: | Line 11: | ||
'''Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pull down menu to choose where an error is reported.''' | '''Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pull down menu to choose where an error is reported.''' | ||
+ | |||
+ | '''The joint cryo-system for target and Torus are operating but apparently the buffer dewer is now full and the system may not be running optimally. Target expert warns that this might result in a target alarm and a target warmup. If there is an alarm due to a target warm up''' | ||
{| {{TableStyle1}} | {| {{TableStyle1}} |
Revision as of 18:08, 4 April 2024
Run Coordinator: Kevin Giovanetti (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pull down menu to choose where an error is reported.
The joint cryo-system for target and Torus are operating but apparently the buffer dewer is now full and the system may not be running optimally. Target expert warns that this might result in a target alarm and a target warmup. If there is an alarm due to a target warm up
Production data taking
In case of the need to manipulate the whole target system - cryotarget or solids - please contact the target experts. LD2+Pb runs
For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 Long term run plan [1] |
ReferencesBPM Positions
Harp ScansFSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!
Charge Asymmetry |
General Reminders
|
DAQ Operation
|