Difference between revisions of "Template:ShortTermSchedule-RGE"
Line 73: | Line 73: | ||
== '''References''' == | == '''References''' == | ||
− | === ''BPM Positions'' === | + | === ''- BPM Positions'' === |
The most important BPMs to monitor are 2C24 and 2H01, from the point of view of assuring the beam remains centered on the RGE target. The values of the others can be influenced by other steering/focusing beamline elements. | The most important BPMs to monitor are 2C24 and 2H01, from the point of view of assuring the beam remains centered on the RGE target. The values of the others can be influenced by other steering/focusing beamline elements. | ||
Line 87: | Line 87: | ||
|} | |} | ||
− | === ''Harp Scans'' === | + | === ''- Harp Scans'' === |
* [https://logbooks.jlab.org/entry/4268480 2C21A] | * [https://logbooks.jlab.org/entry/4268480 2C21A] | ||
* [https://logbooks.jlab.org/entry/4268530 2C24A/Tagger] | * [https://logbooks.jlab.org/entry/4268530 2C24A/Tagger] | ||
* [https://logbooks.jlab.org/entry/4268606 2H01] | * [https://logbooks.jlab.org/entry/4268606 2H01] | ||
− | === ''FSD Thresholds'' === | + | === ''- FSD Thresholds'' === |
'''Do NOT change FSD settings without approval from RC or beamline expert!''' | '''Do NOT change FSD settings without approval from RC or beamline expert!''' | ||
* Upstream: 2 kHz | * Upstream: 2 kHz | ||
Line 100: | Line 100: | ||
* 5 ms dwell time | * 5 ms dwell time | ||
− | === ''Charge Asymmetry'' === | + | === ''- Charge Asymmetry'' === |
* HWP IN: [https://logbooks.jlab.org/entry/4194811 4194811] and [https://logbooks.jlab.org/entry/4195453 4195453] | * HWP IN: [https://logbooks.jlab.org/entry/4194811 4194811] and [https://logbooks.jlab.org/entry/4195453 4195453] | ||
* HWP OUT: [https://logbooks.jlab.org/entry/4195738 4195738] and [https://logbooks.jlab.org/entry/4195733 4195733] | * HWP OUT: [https://logbooks.jlab.org/entry/4195738 4195738] and [https://logbooks.jlab.org/entry/4195733 4195733] | ||
− | === Upstream Halo counters === | + | === ''- Upstream Halo counters'' === |
If the reading on the upstream halo counters exceeds 10, please contact MCC. | If the reading on the upstream halo counters exceeds 10, please contact MCC. | ||
Revision as of 16:03, 8 May 2024
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 911 or 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements.
- In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call: Nathan Baltzell, before reaching out to anyone else.
Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.
Current Run Plan: May 8th to May 15th
Production data taking: LD2+Al runs
Previous Dual-target Configuration PlansDC firmware test plan (LD2 + Pb)1) Take one run each with 1M events with the trigger files and beam current at 70 nA
2) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_2.trg 3) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_4.trg - Before the last run, call DC expert Florian so that he can change the firmware after the last run is finished. - Note:
LD2+Pb runs
LD2+Sn runs
|
References- BPM PositionsThe most important BPMs to monitor are 2C24 and 2H01, from the point of view of assuring the beam remains centered on the RGE target. The values of the others can be influenced by other steering/focusing beamline elements.
- Harp Scans- FSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!
- Charge Asymmetry- Upstream Halo countersIf the reading on the upstream halo counters exceeds 10, please contact MCC. |
General Reminders
|
DAQ Operation
|