Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Friday, March 15 - Monday, March 18
' Special Test Runs:
Start with standard procedures for Beam tuning. In case of the need to manipulate the whole target system - cryotarget or solids - contact with the target experts. Cryocell Empty & PIN data to cache for fast cooking: 1. Double Target system alignment with all solid targets successively on beam position: app. 12 hrs 2. Trigger validation: with random trigger: app. 4 hrs 3. Trigger validation: no DC-roads electron trigger: app 1 hrs 4. PMT gain/HV calibrations for CND/CTOF/ECAL/FTOF with 75M events: app. 4 hrs 5. Zero field alignment run with empty cryotarget, 10M electron triggers with ~3nA current, just before/after a scheduled down time for torus/solenoid ramping: app. 4 hrs 6. Empty cryotarget run with C on: app. 16 hrs
|
ReferencesBPM PositionsNote, these are currently copied from RG-K.
Harp ScansNote, these are currently copied from RG-K. FSD ThresholdsDo NOT change FSD settings without approval from RC or beamline expert!
Charge Asymmetry |
General Reminders
|
DAQ Operation
|