Run Plan for Oct. 6th to Oct. 8th, 2023
- Saturday, Oct. 7th, Day Shift:
- • Solid-target, CxC Configuration, Luminosity Scan:
- ◊ P.S.: Before starting each luminosity scan run, please call in advance the SVT/MVT experts, Yuri and Rafo at least 45 min and 30 min, respectively, to check the HV setting of MVT. Also, keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs.
- ‡ Ask MCC for 10 nA and take a 5 M triggers run with the following configuration:
- - DAQ Config.: PROD66_PIN_noRICH. Follow the DAQ instructions below to change the DAQ configuration and load a new trigger file.
- - Trigger file: rgd_v1.0_no_DC_10nA.trg.
- ‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, monitor the DC occupancy in mon12, then increase the current to 30 nA for another 1.5 or 2 M events, refresh mon12 and monitor the DC occupancy, and then increase the current to 45 nA for the last 1.5 M events while monitoring the DC occupancy in mon12, but with the following trigger file:
- - Trigger file: rgd_v1.0_no_DC_30nA.trg. Follow the DAQ instructions below to load a new trigger file.
- ‡ Once done, take a 15 M run @ 45 nA with the same trigger file and DAQ configuration.
- ‡ Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 50 nA, take roughly 1.5 M events, monitor the DC occupancy in mon12, then increase the current to 75 nA for another 1.5 or 2 M events, refresh mon12, monitor, and log the DC occupancy, and then increase the current to 90 nA for another 1.5 M events while monitoring the DC occupancy in mon12, but with the following trigger file:
- - Trigger file: rgd_v1.0_no_DC_50nA.trg. Follow the DAQ instructions below to load a new trigger file. Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value.
- ‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 75 nA.
- • Once done, ask for 45 nA (seems similar to LD2 @ 50 nA) and take 100 M electron triggers runs with CxC target until the end of the Day shift, but change the DAQ/trigger configuration to:
- - DAQ Config.: PROD66_noRICH. Follow the DAQ instructions below to change its configurations.
- - Trigger file: rgd_v1.0_no_DC.trg. -----If everything goes well, that should bring us to the Swing shift-----
- Saturday, Oct. 7th, Swing Shift:
- • Continue CxC data-taking with 30 nA (TBD after Lumi. scan) and 100 M triggers runs until 10 PM with the same PROD66_noRICH DAQ configuration and rgd_v1.0_no_DC.trg trigger file. Then, we will switch to CuSn target configuration.
- • We will start with centering the beam on CuSn foils prior to performing its Lumi scan.
- • Solid-target, CuSn Configuration, Luminosity Scan:
- ‡P.S.: Before starting each luminosity scan run, please call in advance the SVT/MVT experts, Yuri and Rafo at least 45 min and 30 min, respectively, to check the HV setting of MVT.
- ‡ The luminosity scan will be performed with the specified trigger files but with the same DAQ configuration:
- - DAQ Config.: PROD66_PIN_noRICH. Follow the DAQ instructions below to change its configurations.
- ‡ Ask MCC for 90 nA and take a 5 M triggers run with the following trigger file:
- - Trigger file: rgd_v1.0_no_DC_90nA.trg. ---If everything goes well, that should bring us to the Owl shift---
- Sunday, Oct. 7th, Owl Shift:
- • Solid-target, CuSn Configuration, Luminosity Scan (Cont'd):
- ‡P.S.: Before starting each luminosity scan run, please call in advance the SVT/MVT experts, Yuri and Rafo at least 45 min and 30 min, respectively, to check the HV setting of MVT.
- ‡ Continue the luminosity scan with the specified trigger files but with the same DAQ configuration:
- - DAQ Config.: PROD66_PIN_noRICH. Follow the DAQ instructions below to change its configurations.
- ‡ Next, we will scan three beam currents in this 5 M triggers run. Ask MCC for 110 nA, insert beam blocker in front of the Faraday cup, and take roughly 1.5 M events, monitor the DC occupancy in mon12 and log them, then increase the current to 120 nA, take another 1.5 M events, refresh mon12 and monitor the DC occupancy, and then increase the current to 130 nA for the last 2 M events while monitoring and logging the DC occupancy in mon12, but with the following trigger file:
- - Trigger file: rgd_v1.0_no_DC_100nA.trg. Follow the DAQ instructions below to load a new trigger file.
- ‡ Once done, take a 25 M run @ 130 nA with the same trigger file and DAQ configuration as well as the beam blocker.
- ‡ Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 150 nA, take roughly 1.5 M events, monitor the DC occupancy in mon12, then increase the current to 175 nA for another 1.5 M events, refresh mon12 and monitor the DC occupancy, and then increase the current to 200 nA for the last 2 M events while monitoring the DC occupancy in mon12.. Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value.
- ‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 150 nA.
- • Once done, ask for 130 nA (check with RC/AC after Lumi. scan is done), keep the beam blocker in front of the Faraday cup, and take 100 M electron triggers runs of CuSn until the end of the Owl shift with the following configuration:
- - DAQ Config.: PROD66_noRICH. Follow the DAQ instructions below to change its configurations.
- - Trigger file: rgd_v1.0_no_DC.trg.---If everything goes well, that should bring us to the Day shift---
- Sunday, Oct. 8th, Day Shift:
- • Continue CuSn data-taking with 130 nA (TBD after Lumi. scan is done) and 100 M triggers runs until the end of the Swing shift.-----If everything goes well, that should bring us to the Swing shift----
- Sunday, Oct. 8th, Swing Shift:
- • Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell.
- • Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request:
- - DAQ Config.: PROD66_PIN_noRICH. Follow the DAQ instructions below to change its configurations.
- - Trigger file: rgd_v1.0_no_DC.trg.
- • Once done, we will switch to production mode with outbending configuration:
- - DAQ Config.: PROD66_noRICH. Follow the DAQ instructions below to change its configurations and load new trigger files.
- - Trigger file: rgd_out_v1.0.trg.
- • To-be-continued....
.
DAQ configuration
- Configuration is PROD66_noRICH or PROD66_PIN_noRICH for fast reconstruction of some commissioning/reference runs from the cache disk.
- Trigger file: rgd_inb_v1.0.trg and rgd_out_v1.0.trg for inbending and outbending production.
- NOTE: UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to make a RICH recovery - instead, do this in between runs.
- NOTE: BOTH the shift expert AND the shift worker MUST check and reset monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems. Sometimes, it is the only way to know that a roc needs to be rebooted.
- At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE:
- ◊ "end run."
- ◊ If the run ended correctly and you will run with the same configuration and trigger file, then: "prestart", "go"
- ◊ If you are changing configuration (between PROD6X and PROD6X_PIN) or trigger file: "Cancel", "reset", "configure", "download", "prestart", "go".
- ◊ If the run did not end correctly or if any ROCs had to be rebooted:
- - Quit ALL running instances of mon12
- - "Cancel", "reset"
- - "configure", "download", "prestart", "go"
- - restart mon12
- After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC, and try again. Contact the DAQ expert if there are any questions.
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 100 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [1]; x= -1.4 mm; y= +1.0 mm
- 2C21A [2]; Not done yet for RG-D, but from RG-C:
- Tagger (2C24A [3]; x= -2.0 mm; y= +0.6 mm
|
General Instructions:
- The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights, when switched off, cannot be turned back on immediately because they require 10-15 min to cool down. Now we have a new dome light switch outside of the hall in the labyrinth. The lights can be turned off without entering the hall.
- Do not run more than 30 minutes above 90 nA with a 5-pass beam without the beam blocker in front of the Faraday cup . Put beam blocker in for long-running at high currents for 5-pass operations.
- Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data.
- For beam tuning and Møller runs, please make sure the SVT/MVT are set as follows: SVT: LV ON; HV OFF, and MVT: LV ON; HV ON in SAFE Mode.
- ◊ When turning MVT OFF, do not press "BMT HV OFF" from HV->Overview->Actions, but instead select BMT HV ON - Safe Voltage.
- ◊ When turning MVT ON: go to HV->Overview->Actions, and select BMT HV ON - Full Voltage.
- ◊ DO NOT start Production/Calibration/Various-Studies runs in the SAFE Mode.
- With any issue, contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. If the phone is not answered, try the "Page Experts" button on top of CLASCSS.
- Check for and read any comments to log-book entries made during your shift!
Every Shift:
- Follow the run plan as outlined by RC
- If there is any concern about beam stability, ask MCC if orbit locks are on (they should be).
- Keep shift summary up to date in HBLOG. Record all that happens.
- Document any beam condition change and send scaler GUIs to HBLOG
- If HWP is changed, start a new run
- Upload spectra from clas12mon at the beginning and end of the shift and cross-check with reference spectra (make sure you select the SAME SECTOR for the reference plots on tabs with multiple sectors);
- ◊ Reset clas12mon every ~2 hours and inspect spectra (some detectors have buttons at the bottom to toggle between the sectors -- please check all of them).
Every Run:
- Check values at the start of every run and log screenshots of:
- ◊ Main scaler GUI display
- ◊ Trigger rate GUI
- ◊ Beam strip charts
- ◊ FTC scalers
- At the start and end of every run, check that the data filled in the database run list is correct (especially fields that are filled in manually, like beam current and comments). This replaces the previously used spreadsheet.
To access the Hall:
- If you need to go down into Hall B, alert Denny Insley (757-897-9060, cell/text: 757-810-9576) and the Run Coordinator (757-575-7540).
- Check in with the shift personnel before entering the hall.
|