Run Meeting: March 22nd, 2020
Revision as of 00:36, 22 March 2020 by Gayoso (talk | contribs) (Created page with "Back to Run Group F | Daily Run Group F Coordination Meetings 10:00AM Run Meeting, Counting house meeting room (200C) (NOT) '''RC:''' Carlos Ayerbe ==Su...")
Back to Run Group F | Daily Run Group F Coordination Meetings
10:00AM Run Meeting, Counting house meeting room (200C) (NOT)
RC: Carlos Ayerbe
Summary of past 24h:
- Summary in the RC Daily Report
https://logbooks.jlab.org/entry/3807345
- Owl and Day shifts quite smooth and productive
- Mohammad solution for the RTPC worked (~1 Cathode trip/h)
- Eric optimized the RTPC HV resulting in no more trips
- Half of Swing shift smooth
- Target purge at 19:30h
- trigger rates after the purge reduced ~33%
- The main hypothesis was a not well purge target the day before
- I purged the target two times more manually.
- We continue production with this trigger rate, which apparently is quite similar to the RTPC 1 (???)
Plan:
- Run production
- open discussion to raise beam current up to 400nA
- cry for Deuterium
- Flush Target ~19:00 (I am trying to shorter the purge time to finally have it around noon)
- Time schedule changes accepted
Info
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/7576835804