Run Plan for Tue., Oct. 24th - Mon., Oct. 30th, 2023
- Continue production on CuSn target as follows:
- - Beam current: 90 nA
- - Run duration: 100 M events
- - DAQ configuration: PROD67
- - Trigger file: rgd_out_v2.1_Q2_1.2.trg
- Wednesday, Oct. 25th, Day Shift:
- • MCC Maintenance Day:
- ◊ As soon as the beam is OFF around 7 AM, please call Eugene to start ramping down our solenoid and torus magnets;
- ◊ The Hall will be dropped to "Restricted Access", which requires a full RadCon sweep at the beginning and the end of such access.
- ◊ MCC has been notified, and the RadCon will come to sweep the hall around 9 AM, as the PD mentioned to the RC, but please check with the MCC about the progress toward that;
- ◊ Please keep track of who accessed the hall and the work performed and refer to their entries in the shift summary;
- ◊ As soon as the work is done in the hall, the RadCon can be requested to sweep and thus lock up the hall to switch back to "Beam Permit". Also, Eugene needs to be contacted to ramp up both magnets.
- Wednesday, Oct. 25th, Swing Shift:
- • Please follow the steps to establish the beam to tagger dump, energize the tagger magnet, mask beam halos, and take a harp scan in 2C21 and 2C24A (tagger Harp) using a 5 nA beam current. Please log your results after comparing them with the reference ones at the bottom of this page. Then, take a Møller run with a 1/2-wave plate IN.
- • Next, the collimator needs to be moved to a 20 mm position, unmask beam halos, and change the target to "Empty" from the drop menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: manual. Then, ask for a 5 nA beam to FCup, take a harp scan in 2H01, and compare their results with the reference one at the bottom of this page. Please log these results, too.
- • If everything is fine, please insert CuSn back in the beamline from the same drop-menu mentioned above and resume data-taking on CuSn target as follows:
- - Beam current: 90 nA
- - Run duration: 100 M events
- - DAQ configuration: PROD67
- - Trigger file: rgd_out_v2.1_Q2_1.2.trg
P.S.: If the beam is widely fluctuating above 90 nA, please ask MCC to narrow the fluctuation margin and give us the required 90 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21 in case that may help narrow the fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!
DAQ configuration
- Configuration is PROD66 (or PROD66_PIN for fast reconstruction of some calibration/reference runs from the cache disk);
- ◊ In case of DAQ Disk space alarm, notify the DAQ expert and switch to Configuration PROD67.
- ◊ Inbending production: rgd_inb_v1.0.trg
- ◊ Outbending production: rgd_out_v1.1.trg, or rgd_out_v2.1_Q2_1.2.trg with low-Q2 suppression
- NOTE: UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to make a RICH recovery - instead, do this in between runs. Review its new recovery procedures in HBLOG entry #: 4201728. Note that you have to start new run with CANCEL-RESET after any RICH recovery.
- If rich4 does crash DAQ, do a full recovery before roc_reboot of rich4 an restart DAQ.
- NOTE: BOTH the shift expert AND the shift worker MUST check and reset monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems. Sometimes, it is the only way to know that a roc needs to be rebooted.
- At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE:
- ◊ "end run."
- ◊ If the run ended correctly and you will run with the same configuration and trigger file, then: "prestart", "go"
- ◊ If you are changing configuration (between PROD6X and PROD6X_PIN) or trigger file: "Cancel", "reset", "configure", "download", "prestart", "go".
- ◊ If the run did not end correctly or if any ROCs had to be rebooted:
- - "Cancel", "reset"
- - "configure", "download", "prestart", "go"
- Pop-up window: Enter the beam current and the type of runs (e.g., Production) in the as "Comment" field.
- After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC, and try again. Contact the DAQ expert if there are any questions.
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [1]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [2]: x= -2.0 mm; y= +0.6 mm
- 2C21A [3]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)
IA for Q Asymmetry
|
General Instructions
- The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors (especially, ECAL sec 2 and 3). If these lights are switched on during an access, they should be switched off when leaving the Hall.
- Refer to these photos: ON: [4], OFF: [5]
- We have a new dome light switch outside of the hall in the labyrinth. The lights can be turned off without entering the hall. See https://logbooks.jlab.org/entry/4204460
- Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down.
- Do not run more than 30 minutes above 90 nA with a 5-pass beam without the beam blocker in front of the Faraday cup. Put beam blocker in for long-running at high currents for 5-pass operations.
- Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data.
- RICH issues: put screen shots of scalers and temperatures in the RICH logbook.
- For beam tuning and Møller runs, please make sure the SVT/MVT are set as follows: SVT: LV ON; HV OFF, and MVT: LV ON; HV ON in SAFE Mode.
- ◊ When turning MVT OFF, do not press "BMT HV OFF" from HV->Overview->Actions, but instead select BMT HV ON - Safe Voltage. The same thing applies to FMT select FMT HV ON - Safe Voltage.
- ◊ When turning MVT ON: go to HV->Overview->Actions, and select BMT (/FMT) HV ON - Full Voltage.
- ◊ DO NOT start Production/Calibration/Various-Studies runs in the SAFE Mode.
- With any issue, contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. If the phone is not answered, try the "Page Experts" button on top of CLASCSS.
- Check for and read any comments to log-book entries made during your shift.
Every Shift:
- Follow the run plan as outlined by RC (/AC).
- If there is any concern about beam stability, ask MCC if orbit locks are on (they should be).
- Keep shift summary up to date in HBLOG. Record all that happens.
- Document any beam condition change and send scaler GUIs to HBLOG.
- If HWP is changed, start a new run.
- Upload spectra from clas12mon at the beginning and end of the shift and cross-check with reference spectra (make sure you select the SAME SECTOR for the reference plots on tabs with multiple sectors);
- ◊ Reset clas12mon every ~2 hours and inspect spectra (some detectors have buttons at the bottom to toggle between the sectors -- please check all of them).
Every Run:
- Check values at the start of every run and log screenshots of:
- ◊ Main scaler GUI display
- ◊ Trigger rate GUI
- ◊ Beam strip charts
- ◊ FTC scalers
- At the start and end of every run, check that the data filled in the database run list is correct (especially fields that are filled in manually, like beam current and comments). This replaces the previously used spreadsheet.
To access the Hall:
- If you need to enter Hall B, alert Engineering On-Call (757) 748-5048 and the Run Coordinator (757-575-7540).
- Check in with the shift personnel before entering the hall.
|