Template:ShortTermSchedule-RGK
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes
- Arrive at least 10 minutes early for shift change
- If it is your first shift or a shift after a long pause, do shadow an earlier shift for at least 4 hours to familiarize yourself with all shift duties and technicalities of the ongoing experiment.
- Refresh the run wiki page/tabs; look over it/them every shift
- Follow the Shift Expert/Worker tab's instructions
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
See tab GENERAL INFORMATION for
- Recent Changes
- Current Issues
- Beam Restoration (for beam restoration procedures and Møller runs)
Run Plan: Feb. 7, 2024
Beam Restoration
- Tune beam to tagger yoke dump at 5 nA - Take Moller run at 20 nA - Tune 5 nA beam to Faraday cup
Empty Target Run
- Ramp beam up to 150 nA and check halo monitors at 50 nA, 100 nA, 150 nA - If beam is good, turn off beam, insert beam blocker, ramp beam up to 200 nA -- DAQ configuration: PROD67 -- Trigger: rgk_noDC_empty_v1.1_300MeV.trg -- Take 10 M triggers -- post online reconstruction plots in logbook - Turn off beam, remove beam blocker - Fill LH2 target
Special Configuration Runs
- Take data without HTCC in the trigger -- DAQ configuration: PROD67 -- Trigger: rgk_noHTCC_noDC_v1.1_300MeV.trg - Beam current request: TBD - adjust beam current to give bit #0 trigger rate = 25 kHz) - call Valery to check trigger setup and beam current choice - Run duration: 2 hrs
- Take luminosity scan data at beam currents of 5 nA, 15 nA, 30 nA, 45 nA (at 2C21A) -- DAQ configuration: PROD67 -- Trigger files: --- rgk_5nA_noDC_v1.1_300MeV.trg (5 nA) --- rgk_15nA_noDC_v1.1_300MeV.trg (15 nA) --- rgk_30nA_noDC_v1.1_300MeV.trg (30 nA) --- rgk_45nA_noDC_v1.1_300MeV.trg (45 nA) - Run duration: 10M triggers for each beam current
Production Running
- DAQ configuration: PROD67 - Trigger: rgk_noDC_v1.1_300MeV.trg - Beam current request: 65 nA (at 2C21A) - Run duration: 3 hrs
- DAQ livetime ~90% - R1 DC occupancy <5%
Related Information
Find detailed information at tab "GENERAL INFORMATION".
- The main lights in the Hall (dome lights) and the Forward Carriage lights must be OFF during run time.
- Orbit locks are on BPMs 2C24A and 2H01 and the locks should generally be on ("Running").
- Beam positions at 2C24A and 2H01 have to be kept, within ±0.1mm, at the nominal beam positions listed below ("Reference Values").
- The beam position at 2C21A is not important for production runs but should be stable. Here, significantly drifting positions can indicate instabilities in beam energy.
- The beam position at 2C21A is important for initial beam tuning (on tagger dump).
- If HWP is changed, start a new run. The absolute values of the SLM and FCUP charge asymmetry (Q-Asym (%)) should be less than 0.1%.
- Beam tuning and Møller runs
- Generally, Detector HV OFF but
- SVT: LV ON; HV OFF, and MVT: LV ON; HV ON - Safe Voltage
- Turn DC HV off only for beam tuning
Access to the Hall
- If you need to enter Hall B, alert Denny Insley (757-897-9060, cell/text: 757-810-9576) and the Run Coordinator (757-575-7540).
- Check in with the shift personnel before entering the hall.
DAQ Operation & Related Information
NEW STANDARD end and start of the run:
This will ensure proper compression of the FADCs and therefore a smaller data rate and perform a RICH recovery. Restart DAQ
|
|
Triggers files
rgk_noDC_v1.0_300MeV.trg | DC roads are not in the trigger. Hold off time is 3 us. |
rgk_noDC_v1.1_300MeV.trg | DC roads are not in the trigger. Hold off time is 2 us. |
rgk_noDC_v1.2_300MeV.trg | DC roads are not in the trigger. Hold off time is 1 us. |
rgk_out_v1.1_300MeV.trg | Outbending DC roads, Hold off time is 2 us. |
Reference Values
FSD Thresholds
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Nominal Beam Positions
2C24A
- x = -1.7 mm
- y = +0.5 mm
2H01
- x = -0.7 mm
- y = +0.6 mm
2C21A (not important for production)
- x = -0.4 mm
- y = +0.7 mm
Harp Scan References
Tagger (2C24A): Jan. 18, 2024, https://logbooks.jlab.org/entry/4240378
2H01: Jan. 18, 2024, https://logbooks.jlab.org/entry/4240397
2C21A: Jan. 18, 2024, https://logbooks.jlab.org/entry/4240375