Template:ShortTermSchedule-RGK

From clas12-run
Jump to navigation Jump to search

Experiment Coordinator: Annalisa D'Angelo

Run Coordinator: Daniel Carman (757) 575-7540

PDL: Daniel Carman (757) 876-1789

Daily RC Meetings

Important Notes

Do NOT change FSD settings without approval from RC or beamline expert!

In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.

In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.

If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.

Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!

Note to Shift Takers:

  • Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
  • Read at least the previous 24 hours logbook entries to be aware of recent run details and changes
  • Arrive at least 10 minutes early for shift change
    • If it is your first shift or a shift after a long pause, do shadow an earlier shift for at least 4 hours to familiarize yourself with all shift duties and technicalities of the ongoing experiment.
  • Refresh the run wiki page/tabs; look over it/them every shift
  • Follow the Shift Expert/Worker tab's instructions
  • Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.

See tab GENERAL INFORMATION for

  • Recent Changes
  • Current Issues
  • Beam Restoration (for beam restoration procedures and Møller runs)

Run Plan: Feb. 27 - Mar. 4, 2024

Production Running (run until beam off for maintenance day/beam studies Feb. 28 at 7 a.m.)

- DAQ configuration: PROD67, Trigger: rgk_noDC_v1.1_300MeV.trg
- Beam current request: 75 nA (at 2C21A)
- Run duration: 3 hrs
  • NOTE - For the alarm B_DAQ_VTPGT:TrigBit:normAlarm accompanied with red boxes surrounding a single sector on the CLAS12 Trigger Bit screen for "Outbending_SX" and "Inbending_SX" for sector X - If no ROCs show 100% busy and mon12 shows the data is not affected, let the run continue until its normal 3-hr end. Then reboot the three ROCs for the affected sector (e.g. roc_reboot DCX1, roc_reboot DCX2, roc_reboot DCX3, where X=1,...,6) and restart DAQ in full (cancel, reset, configure, download, prestart, go).

Maintenance Day/Beam Studies (Feb. 28 7 a.m. - 10:30 p.m.)

- When beam goes off, put BMT HV in safe mode and turn DC HV off (other detectors remain on)
- Survey FMT (RadCon)
- Check on Pie Tower tranceiver (Sergey)
- Survey downstream alcove for Rafo (escorted access with RadCon)
- Adjust FC offset (Rafo)
- Work on FMT (Yuri, Rafo)
- Check torus ice build-up on VCL (Daniel, Denny)
- SAF111 walkthrough (Eugene + folks)
- Hall B Photograghs (Raffaella + Aileen)

Beam Restore

- Energize tagger magnet and prepare for beam delivery to tagger yoke dump (blank collimator, beam type photon, CLAS12 detectors off (BMT HV in safe mode)
- Tune beam to tagger yoke dump at 5 nA (contact Eugene for questions)
- Take harp scans at 2C21A and 2C24A and compare to reference plots
- Take two Moller runs at 20 nA with HWP out (Helmholtz polarity negative and positive) (contact Nathan for questions)
- Call MCC to change HWP to in (coordinate with Hall C beforehand!); after transition contact Hall C to
  run flipper script; check charge asymmetry (contact Eugene if it is outside tolerance)
- Take two Moller runs at 20 nA with HWP in (Helmholtz polarity negative and positive)
- Turn beam off and degauss tagger magnet (20 mm collimator, beam type electron)
- Tune 5 nA beam to Faraday cup (check beam positions) (contact Eugene for questions)
- Take harp scan at 2H01 and compare to reference plot
- When the tune is acceptable (halo monitors and beam positions at 2C21A, 2C24A, 2H01), turn all CLAS12 detectors on

Production Running

- DAQ configuration: PROD67, Trigger: rgk_noDC_v1.1_300MeV.trg
- Beam current request: 65 nA (at 2C21A)
- Run duration: 3 hrs
- Take production data until Rafo is available for beam blocker calibration (~10:30 a.m.)

Empty Target Running

- Turn beam off and empty LH2 target
- Complete beam blocker calibration (Rafo will lead effort, duration 2 hrs). Note: Beam blocker must be installed
  for running more than 5 minutes above 100 nA
- When beam blocker calibration is finished, install beam blocker. Request 200 nA to the FC and begin DAQ for
  empty target running. Take 3 hr runs until charge collection is 10 mC (10-12 hrs of good beam)

Luminosity Scan

- Take production data at beam currents of 5 nA, 30 nA, 50 nA
- DAQ configuration: PROD67, Trigger: rgk_noDC_v1.1_300MeV.trg
- Run duration: 10M triggers for each beam current
- 5 nA DAQ configuration: PROD67, Trigger: rgk_5na_noDC_v1.1_300MeV.trg
- 30 nA DAQ configuration: PROD67, Trigger: rgk_30na_noDC_v1.1_300MeV.trg
- 50 nA DAQ configuration: PROD67, Trigger: rgk_45na_noDC_v1.1_300MeV.trg

Production Running

- DAQ configuration: PROD67, Trigger: rgk_noDC_v1.1_300MeV.trg
- Beam current request: 65 nA (at 2C21A)
- Run duration: 3 hrs

Related Information

Find detailed information at tab "GENERAL INFORMATION".

  • The main lights in the Hall (dome lights) and the Forward Carriage lights must be OFF during run time.
  • Orbit locks are on BPMs 2C24A and 2H01 and the locks should generally be on ("Running").
    • Beam positions at 2C24A and 2H01 have to be kept, within ±0.1mm, at the nominal beam positions listed below ("Reference Values").
  • The beam position at 2C21A is not important for production runs but should be stable. Here, significantly drifting positions can indicate instabilities in beam energy.
    • The beam position at 2C21A is important for initial beam tuning (on tagger dump).
  • If HWP is changed, start a new run. The absolute values of the SLM and FCUP charge asymmetry (Q-Asym (%)) should be less than 0.1%.
  • Beam tuning and Møller runs
    • Generally, Detector HV OFF but
    • SVT: LV ON; HV OFF, and MVT: LV ON; HV ON - Safe Voltage
    • Turn DC HV off only for beam tuning

Access to the Hall

  • If you need to enter Hall B, alert Denny Insley (757-897-9060, cell/text: 757-810-9576) and the Run Coordinator (757-575-7540).
  • Check in with the shift personnel before entering the hall.

DAQ Operation & Related Information

NEW STANDARD end and start of the run:

- "End run"
- "Cancel"
- "Reset"
- "Download"
- "Prestart"
- "Go"

This will ensure proper compression of the FADCs and therefore a smaller data rate and perform a RICH recovery.

Restart DAQ

-- when changing configuration or trigger files, when the run did not end correctly, when ROCs are rebooted, or after RICH recovery:
- "Cancel"
- "Reset"
- "Configure"
- "Download"
- "Prestart"
- "Go"
  • Restart DAQ: ensure that each step is completed in the Run Control message window. During "Configure", look for error messages in the ROC terminals.
  • Some ROCs keep printing error messages while functioning properly, see logbook entry # 4215299 .
  • If a ROC is disconnected, the message will appear in the run control message window.
  • If a ROC has crashed.
    • Find out which one (look for busy ROCs)
    • End the current run
    • Issue a roc_reboot command on just that ROC
    • PING the ROC to check that it is back up (some take longer than others)
    • Restart DAQ
  • Pop-up window: Enter the beam current and the type of run in the "Comment" field.
  • At the start and end of a run, check that the data in the Run Condition Data Base (RCDB) is correct, especially the manually filled fields.
  • Check and reset monitoring histograms every hour. Sometimes, it is the only way to know that a specific ROC needs to be rebooted.
  • In case of DAQ Disk space alarm, call the DAQ expert.
  • Contact the DAQ expert if you have any questions or doubts about how to proceed.

Triggers files

rgk_noDC_v1.0_300MeV.trg DC roads are not in the trigger. Hold off time is 3 us.
rgk_noDC_v1.1_300MeV.trg DC roads are not in the trigger. Hold off time is 2 us.
rgk_noDC_v1.2_300MeV.trg DC roads are not in the trigger. Hold off time is 1 us.
rgk_out_v1.1_300MeV.trg Outbending DC roads, Hold off time is 2 us.

Reference Values

FSD Thresholds

  • Upstream: 2 kHz
  • Midstream: 2 kHz
  • Downstream: 100 kHz
  • BOM: 50 kHz
  • 5 ms dwell time

Nominal Beam Positions

2C21A (not important for production)

  • x = -0.4 mm
  • y = +0.7 mm

2C24A

  • x = -1.7 mm
  • y = +0.5 mm

2H01

  • x = -0.7 mm
  • y = +0.6 mm

8.5 GeV Harp Scan References (Feb. 14, 2024)

2C21A: https://logbooks.jlab.org/entry/4252495

Tagger (2C24A): https://logbooks.jlab.org/entry/4252496

2H01: https://logbooks.jlab.org/entry/4252514

6.4 GeV Harp Scan References (Jan. 18, 2024)

2C21A: https://logbooks.jlab.org/entry/4240375

Tagger (2C24A): https://logbooks.jlab.org/entry/4240378

2H01: https://logbooks.jlab.org/entry/4240397