Engineering Run

From clas12-run
Revision as of 12:04, 28 January 2018 by Devita (Talk | contribs) (Short Term Schedule)

Jump to: navigation, search
[edit]
Person Phone Number
Run Coordinator 9-757 575-7540 (cell)
Physics Division Liaison 9-757 876-1789 (cell)
Run Group C coordinator 9-757 639-6640 (cell)
Shift Expert 5244 or 9-757 329-4846 (cell)
Shift Worker 5126
MCC-OPS 7048
Crew Chief 7045
Crew Chief 9-757 876-3367 (cell)
Program Deputy 9-757 876-7997 (cell)
Engineering on-call 9-757 748-5048 (cell)
Engineering on-call secondary 9-757 897-9060 (cell)
Radcon (needed for target cell swaps) 9-757 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall-B Floor 5165
Hall-B Space Frame 5170, 5171
Hall-B Forward Carriage 5371
Hall-B Counting Room 5245 (Shift1), 5126 (Shift2)
Hall-B Counting Room 5244 (Expert)
Hall-B Gas Shed 7115
System Phone Number On-Call Person
DC (757) 748-5048 (cell) Engineering On-Call
SVT + MM (757) 541-7539 (cell) Yuri Gotra Primary
SVT + MM (757) 753-7769 (cell) Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF (757) 344-7204 (cell) Jose Carvajal
CND (757) 344-7204 (cell) Jose Carvajal
HTCC-LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell) Valery Kubarovsky
DAQ (757) 232-6221 (cell) Sergey Boiarinov
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
Pol. Target On-Call (757)-218-2266 (cell) See schedule or call RC
Polarized Target (757) 746-9277 (cell) Chris Keith
Polarized Target (757) 897-1415 (cell) James Maxwell
Polarized Target (757) 871-5374 (cell) James Brock
Target (not used) (757) 822-9586 (cell) Bob Miller Primary
Target (not used) (757) 897-9060 (cell) Denny Insley Secondary
Counting House C x6000
Counting House D x5504

In case of a problem with superconducting magnets call Engineering on-call first, particularly if it is related to cryo.
For all other superconducting magnet problems call magnet group.
Their schedule and phone numbers are posted on the wall next to the Saclay target computer.




Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)

RC: Raffaella De Vita

  • (757) 575-7540
  • 9 575 7540 from Counting Room
  • devita@jlab.org

PDL: Eugene Pasyuk

  • (757) 876-1789
  • 9 876-1789 from Counting Room
  • pasyuk@jlab.org


  • Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
  • Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
  • Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=0.0 mm)

Run Plan:

(last update 1/27 - 6:00 pm)

  • Continue data taking at 100% torus field (negatives inbending) and solenoid to 100% field. DAQ configuration PROD6 (selected by clicking on Configure before the Download), trigger file elec_htcc_1phe_pcal_300.trg (selected at the Download), beam position as indicated above. Make sure FSD thresholds are set correctly (refer to the "Establish-physics quality beam" procedure at [1]), integration time is set to 5 ms, and that the orbit locks are on.
  • Once the RICH special runs are complete, start readout/trigger studies.
  • Take data at 30 nA with increased TET thresholds on FTOF a CTOF:
    • TET 150: 1 h run
    • TET 200: 1 h run
  • Switch to HTCC studies. Ask the DAQ expert to load gains for the HTCC in fADC and take 4 runs with different trigger files, 30 min each:
    • elec_pcal_300.cnf: HTCC threshols is 0.5 phe
    • elec_htcc_1phe_pcal_300.cnf
    • elec_htcc_3phe_pcal_300.cnf
    • elec_htcc_5phe_pcal_300.cnf
  • Switch to FT studies: ask the DAQ expert to select an FTonly trigger setting adequate prescale factors to keep the trigger rate at acceptable rate. Take three runs at different currents of 25, 50, 75 nA.


General Instructions:

  • For a given beam current, compute the FSD thresholds according to the Establish Physics Quality Beam document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
  • Do not run more than 60 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
  • Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
  • In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
  • With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
  • All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed.
  • Check that no unecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens.

Every Shift:

  1. Follow run plan as outlined by RC
  2. If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  3. Keep shift summary up to date in HBLOG. Record all that happens.
    • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
    • Document any beam condition change and send scaler GUIs to HBLOG
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
    • Fill and submit the shift checklist in the logbook
  4. Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF.

Every Run:

  1. Log screenshots of:
    • main scaler GUI display
    • Detector occupancy plots
    • Trigger rate gui
    • Beam strip charts


Clas12design.png