Difference between revisions of "RGM RC Meeting Dec15 Dec22"

From clas12-run
Jump to navigation Jump to search
Line 7: Line 7:
 
*** Cryo alarm was cleared by engineering
 
*** Cryo alarm was cleared by engineering
 
* Issues
 
* Issues
** FMT layer 3 missing strips (maybe hardware issue)
+
** FMT layer 3 with missing strips (maybe hardware issue)
 
* Upcoming Plan
 
* Upcoming Plan
 
** Target change is scheduled for Friday at 7:30: LD2 --> LHe
 
** Target change is scheduled for Friday at 7:30: LD2 --> LHe
 
* Analysis
 
* Analysis

Revision as of 17:15, 15 December 2021

Wednesday, December 15, 2021

  • RC Hand-Off at 14:00
  • Last 24 hours
    • Target change to LD2, beam available around 22:00
    • Production running started around 2:00
    • Torus cryo communication issue at 3:20, continued data taking
      • Cryo alarm was cleared by engineering
  • Issues
    • FMT layer 3 with missing strips (maybe hardware issue)
  • Upcoming Plan
    • Target change is scheduled for Friday at 7:30: LD2 --> LHe
  • Analysis