Difference between revisions of "RGM RC Meeting Dec15 Dec22"

From clas12-run
Jump to navigation Jump to search
Line 30: Line 30:
 
** 7:30 Change target from LD2 to LHe4
 
** 7:30 Change target from LD2 to LHe4
 
** 10:45 Beam set up and beam blocker calibration
 
** 10:45 Beam set up and beam blocker calibration
** 12:00 Production running on LHe4 with 60 nA
+
** 12:00 Production running on LHe4 with 60 nA (about 100 M events collected)
 
* Issues
 
* Issues
 
** Ongoing: FMT layer 3 with missing strips (maybe hardware issue)
 
** Ongoing: FMT layer 3 with missing strips (maybe hardware issue)

Revision as of 16:12, 17 December 2021

Wednesday, December 15, 2021

  • RC Hand-Off at 14:00
  • Last 24 hours
    • Target change to LD2, beam available around 22:00
    • Production running started around 2:00
    • Torus cryo communication issue at 3:20, continued data taking
      • Cryo alarm was cleared by engineering
  • Issues
    • FMT layer 3 with missing strips (maybe hardware issue)
  • Upcoming Plan
    • Target change is scheduled for Friday at 7:30: LD2 --> LHe
  • Analysis

Thursday, December 16, 2021

  • Last 24 hours
    • Production running on LD2 with 50 nA
    • About 600 M events collected
  • Issues
    • Ongoing: FMT layer 3 with missing strips (maybe hardware issue)
  • Upcoming Plan
    • Target change is scheduled for Friday at 7:30: LD2 --> LHe
    • Expect to ask for beam between 12:00 and 16:00
  • Analysis

Friday, December 17, 2021

  • Last 24 hours
    • Production running on LD2 with 50 nA (about 400 M events collected)
    • 0:30 Torus power supply communication problem (did not affect data taking)
    • About 2.5 hours no beam during owl shift
    • 7:30 Change target from LD2 to LHe4
    • 10:45 Beam set up and beam blocker calibration
    • 12:00 Production running on LHe4 with 60 nA (about 100 M events collected)
  • Issues
    • Ongoing: FMT layer 3 with missing strips (maybe hardware issue)
  • Upcoming Plan
    • Data taking with 60 nA on LHe4 target
  • Analysis