Run Meeting: August 13th, 2020

From clas12-run
Revision as of 11:41, 13 August 2020 by Gayoso (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Run Group F | Daily Run Group F Coordination Meetings

12:00PM Run Meeting, Counting house meeting room (200C) ONLINE

RC: Carlos Ayerbe

Summary of past 24h:

RC report from Stephen: https://logbooks.jlab.org/entry/3825827

Shifters summary:

Day: https://logbooks.jlab.org/entry/3825613
Swing:https://logbooks.jlab.org/entry/3825902
Owl: https://logbooks.jlab.org/entry/3826129


  • Electric storm caused some beam delays (https://logbooks.jlab.org/entry/3825867)
  • Deuterium bottle was changed. It was reported a possible issue with the high pressure gauge, but nothing critical.
  • Valery K, requested to change the trigger configuration file as was agreed early. Note: sometimes, the GUI won't show the uploaded trigger file, here is the simple solution: https://logbooks.jlab.org/entry/3825867
  • Mohammad requested an increase of current from 200nA to 240nA for testing purposes (just one run, ~ 05:30).
  • Due to beam studies, beam will be down for 2 hours (09-11:00). It was finished early.

Plan:

Continue taking data.

Info

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/7576835804