Run Meeting: August 1st, 2020

From clas12-run
Revision as of 10:20, 1 August 2020 by Narbe (talk | contribs) (→‎Summary of past 24h:)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Bluejeans = 757 683 5804

RC: Narbe Kalantarians

Summary of past 24h:

  • Summary in the RC Daily Report

https://logbooks.jlab.org/entry/3818916

Plan for next 24 hours

Tune harps

Tune beam to FC, and have RTPC expert fill H2 target.

Physics beam 5 nA Take 1-pass data with out-bending torus field (-1885 A) and solenoid (1935 A). Takes runs with ~5M events or 2 hours (whichever comes first).