Difference between revisions of "Run Meeting: August 5th, 2020"

From clas12-run
Jump to navigation Jump to search
(Created page with "Back to Run Group F | Daily Run Group F Coordination Meetings 10:00AM Run Meeting, Bluejeans = 757 683 5804 '''RC:''' Narbe Kalantarians ==Summary of pa...")
 
 
(One intermediate revision by one other user not shown)
Line 16: Line 16:
 
Establish beam to the tagger. Set positions on 2C21 and 2C24 to our nominal. Do harp scans 2C21 and 2C24 and compare with the latest. If they look good then degauss tagger and send beam to the Faraday cup and do harp scans.
 
Establish beam to the tagger. Set positions on 2C21 and 2C24 to our nominal. Do harp scans 2C21 and 2C24 and compare with the latest. If they look good then degauss tagger and send beam to the Faraday cup and do harp scans.
  
Take 1-pass intending torus B-field data on Hydrogen target.
+
Take 1-pass inbending torus B-field data.
 +
 
 +
15-20M (Ideally 30M) on Deuterium
 +
 
 +
5-10 M on empty
 +
 
 +
15-20M Hydrogen  
 +
 
 +
5-10 M on He4
 +
 
 +
If time lost: 20M D2, 20M H2, 5M Empty, 5M He4
 +
 
 +
Start with 10nA, and adjust as needed to keep Livetime at at least 80%, and ~2KHz trigger rate. Might need attenuator if exceeding FC limits (will consult with Stepan).

Latest revision as of 14:19, 5 August 2020

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Bluejeans = 757 683 5804

RC: Narbe Kalantarians

Summary of past 24h:

  • Summary in the RC Daily Report

https://logbooks.jlab.org/entry/3820820

Plan for next 24 hours Detectors on and magnets ramped to nominal settings (outbidding torus B-field); waiting on beam.

Establish beam to the tagger. Set positions on 2C21 and 2C24 to our nominal. Do harp scans 2C21 and 2C24 and compare with the latest. If they look good then degauss tagger and send beam to the Faraday cup and do harp scans.

Take 1-pass inbending torus B-field data.

15-20M (Ideally 30M) on Deuterium

5-10 M on empty

15-20M Hydrogen

5-10 M on He4

If time lost: 20M D2, 20M H2, 5M Empty, 5M He4

Start with 10nA, and adjust as needed to keep Livetime at at least 80%, and ~2KHz trigger rate. Might need attenuator if exceeding FC limits (will consult with Stepan).