Difference between revisions of "Run Meeting: August 8th, 2020"

From clas12-run
Jump to navigation Jump to search
(Created page with "==Summary of past 24h:== Friday, August 7 to Saturday, August 8 5-pass beam setup completed. Polarization measurement of about 0.84. '''Plan for next 24 hours''' Day shi...")
 
Line 4: Line 4:
  
 
5-pass beam setup completed.
 
5-pass beam setup completed.
 +
 
Polarization measurement of about 0.84.
 
Polarization measurement of about 0.84.
  
Line 11: Line 12:
  
 
Day shift accelerator work, probably no physics beam until Saturday swing shift.
 
Day shift accelerator work, probably no physics beam until Saturday swing shift.
 +
 
Swing shift data taking.
 
Swing shift data taking.

Revision as of 09:40, 8 August 2020

Summary of past 24h:

Friday, August 7 to Saturday, August 8

5-pass beam setup completed.

Polarization measurement of about 0.84.


Plan for next 24 hours

Day shift accelerator work, probably no physics beam until Saturday swing shift.

Swing shift data taking.